Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Works Of Turbine And Generator Of Unit No. 13, 2 X200 Mw, Btps, Obra
|
| Description |
Overhauling Works Of Turbine And Generator Of Unit No. 13, 2 X200 Mw, Btps, Obra
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2025_RVUNL_1059186_1 |
|
Reference Number |
W/OBR/SE2/TMD2/8525/OH-13 |
| Tender Fee | 1770 |
| EMD | 96000 |
| Tender Value | - |
| Place | BTPS, Obra |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1928520 |
| Start Date | July 23, 2025 19:30 |
| End Date |
Expired
13/08/2025
Expired 382 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Servicing and overhauling of 8 mva, 66/11kv rbk2 unit generator transformer along with refilling of new transformer oil at bhadra generating station
Servicing and overhauling of 8 mva, 66/11kv rbk2 unit generator transformer along with refilling of new transformer oil at bhadra generating station as per scope of work mentioned in section-iii of the tender document.
Read moreConstruction of moulana azad school (school building at g plus 2 floors and other infrastructure works) for minority department at kembhavi, yadgiri district (new work) (fixed price no variation) package - 13
Construction of moulana azad school (school building at g plus 2 floors and other infrastructure works) for minority department at kembhavi, yadgiri district (new work) (fixed price no variation) package - 13
Read morePeriodical special assistance for preventive breakdown electrical maintenance and annual overhauling works of lt switch gear and lt motors in outlying areas of unit 1 to 8 for the year 2026-27 pertaining to ee(ola)e division for the period of one year
Detailed scope of work is mentioned in bid document
Read moreOverhauling of air preheaters and rectification of flue gas ducts from eco outlet to aph inlet, id fans, fd fans, pa fans, scanner air fans, hotwell make up pumps, boiler fill pump and associated works of 3x210 mw, unit-1 to 4 boilers (oh-5)
Overhauling of air preheaters and rectification of flue gas ducts from eco outlet to aph inlet, id fans, fd fans, pa fans, scanner air fans, hotwell make up pumps, boiler fill pump and associated works of 3x210 mw, unit-1 to 4 boilers (oh-5)
Read moreOverhauling of cw pupm of unit no.09 2x200mw ,btps,obra
Overhauling of cw pumps, butterfly valves, submerged structure of tws, revisioning servicing of tws, changing of damaged link and rollers of haulage chain of tws, servicing of gear box of tws, repairing of damaged basket frame,of unit no.09 2x200mw
Read moreOverhauling of generator transformer of 200mw unit no.13, btps, obra
Overhauling of generator transformer of 200mw unit no.13, btps, obra
Read moreWork of insulation of pipelines, valves, turbine etc., in unit-12 turbine side during overhauling of unit 12 of 2x200mw,btps,obra
Work of insulation of pipelines, valves, turbine etc., in unit-12 turbine side during overhauling of unit 12 of 2x200mw,btps,obra
Read moreOverhauling of valve, special valve, heater, deaerator, etc of unit no.-12 of 2x200mw, btps,obra
Overhauling of valve, special valve, heater, deaerator and etc. during overhauling of unit no.-12 of 2x200mw, btps, obra
Read moreWork of insulation of turbine, valves, pipelines of turbine side during overhauling of unit 13, btps, obra
Work of insulation of turbine, valves, pipelines of turbine side during overhauling of unit 13, btps, obra
Read moreCapital overhauling of turbine, generator and its associated system of unit no 09th 200 mw btps obra
Capital overhauling of turbine, generator and its associated system of unit no 09th 200 mw btps obra
Read moreof your Industry type