Tender Details

Particulars Details
Title
Execution Of Balance Work For Providing Flooring At Silo, Boiler Unit 2 And Dm Plant Area As Desired By Generation Authority For Smooth Operation And Maintenance Activities Of Stage I, 2x600 Mw, Sstpp, Dongalia Khandwa.
Description
Execution Of Balance Work For Providing Flooring At Silo, Boiler Unit 2 And Dm Plant Area As Desired By Generation Authority For Smooth Operation And Maintenance Activities Of Stage I, 2x600 Mw, Sstpp, Dongalia Khandwa.
Organisation Madhya Pradesh Power Generating Company Limited | State Govt. and UT
Tender Id 2024_MPPGC_378522_1
Reference
Number
WT-2489
Tender Fee 795
EMD 6800
Tender Value
Place SE PURCHASE AND WORK SSTPP DONGALIA
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=454065
Start Date December 03, 2024 00:25
End Date

20/12/2024 ( Expired 194 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of laterals for sba ( strong base anion) at dm plant and crt (cation regeneration unit) at cpu regeneration area of tmd off site, at 2x660mw, sstpp, stage-ii, mppgcl, dongalia.

Procurement of laterals for sba ( strong base anion) at dm plant and crt (cation regeneration unit) at cpu regeneration area of tmd off site, at 2x660mw, sstpp, stage-ii, mppgcl, dongalia.

Read more
Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month

Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month

Read more
Work contract for overhauling of suspended magnet (sm) and inline magnetic separator (ilms) at 2x600 mw, ph-i, chp, 2x600mw, sstpp, mppgcl, dongalia

Work contract for overhauling of suspended magnet (sm) and inline magnetic separator (ilms) at 2x600 mw, ph-i, chp, 2x600mw, sstpp, mppgcl, dongalia

Read more
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks

Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks

Read more
Procurement of weldon grey cement compound for various cpcv/pvc lines installed at dm plant,etp, stp at tmdosi 2x600 mw sstpp dongalia

Procurement of weldon grey cement compound for various cpcv/pvc lines installed at dm plant,etp, stp at tmdos i 2x600 mw sstpp dongalia

Read more
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.

Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.

Read more
Procurement of non asbestos gland packing rope for various pumps at tmdos area at 2x600 mw unit 1 and 2 sstpp mppgcl dongalia

Procurement of non asbestos gland packing rope for various pumps at tmd os area at 2x600 unit 01 and 02 sstpp mppgcl dongalia

Read more
Annual maintenance contract (amc) of various landt make various hydraulic power pack systems installed at 2x600 mw chp ph-i and 2x660 mw chp ph-ii, sstpp, mppgcl, dongalia for 05 years

Annual maintenance contract (amc) of various landt make various hydraulic power pack systems installed at 2x600 mw chp ph-i and 2x660 mw chp ph-ii, sstpp, mppgcl, dongalia for 05 years

Read more
Work contract for ge/alstom make numerical relay testing work installed in grp, upp, strp of unit-4 and 400 kv switchyard at 2x660 mw, sstpp, stage-ii, mppgcl,dongalia.

Work contract for ge/alstom make numerical relay testing work installed in grp, upp, strp of unit-4 and 400 kv switchyard at 2x660 mw, sstpp, stage-ii, mppgcl,dongalia.

Read more
Work contract for de-silting work at channel and fore-bay area of cw pump house at 2x600 mw,sstpp,mppgcl,dongalia.

Work contract for de-silting work at channel and fore-bay area of cw pump house at 2x600 mw,sstpp,mppgcl,dongalia.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise