Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Installation Testing And Commissioning For Ht Extension In Nubra Section On Full Turnkey Basis Under District Capex 2025 26
|
| Description |
Same As Above
|
| Organisation | Power Development and Non-Renewable Energy | State Govt. and UT |
| Tender Id | 2025_PDNRE_17109_1 |
|
Reference Number |
e-NIT No. 104 of ED Leh of 2025-26 dated 02-08-2025 |
| Tender Fee | 1000 |
| EMD | 32000 |
| Tender Value | - |
| Place | Leh |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=41812 |
| Start Date | August 03, 2025 15:30 |
| End Date |
Expired
13/08/2025
Expired 430 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Lt extension, ht/lt improvement/stablization of various locations at dessa on bhagwah feeder in electric sd doda i under the jurisdiction of jpdcl ed doda on full turnkey basis. under ut capax
Lt extension, ht/lt improvement/stablization of various locations at dessa on bhagwah feeder in electric sd doda i under the jurisdiction of jpdcl ed doda on full turnkey basis. under ut capax
Read moreE-14 (26-27) medical equipment full room digital radiography turnkey project
E-14 (26-27) medical equipment full room digital radiography turnkey project
Read moreProviding and fixing 11kv ht line works for load extension at panchak stp.
Providing and fixing 11kv ht line works for load extension at panchak stp.
Read moreLaying of epoxy heavy duty flooring for extension of new hr bay shed on turnkey basis
Laying of epoxy heavy duty flooring for extension of new hr bay shed on turnkey basis
Read moreImprovement strengthening extension of pipe network at ward no. 1,2,3 and 17.(under distt. capex)
Improvement strengthening extension of pipe network at ward no. 1,2,3 and 17.(under distt. capex)
Read moreImprovement strengthening extension of pipe network at ward no. 4,5,6 and 16.(under distt. capex)
Improvement strengthening extension of pipe network at ward no. 4,5,6 and 16.(under distt. capex)
Read moreImprovement strengthening extension of pipe network at ward no. 7,8,9 and 10. (under distt. capex)
Improvement strengthening extension of pipe network at ward no. 7,8,9 and 10. (under distt. capex)
Read moreSupply, installation, testing and commissioning for creation of 400kva substation for sdm office and residential quarters at kharu on full turnkey
Supply, installation, testing and commissioning for creation of 400kva substation for sdm office and residential quarters at kharu on full turnkey
Read moreSupply, installation, testing and commissioning for lt extension of single phase 3 phase to residential block and hostel block at gdc nubra under sdp for the fy 2026 27.
Supply, installation, testing and commissioning for lt extension of single phase 3 phase to residential block and hostel block at gdc nubra under sdp for the fy 2026 27.
Read moreof your Industry type