Tender Details

Particulars Details
Title
Cost Of Establishing Solar Power Fencing System From Kulangarapadi To Vadakkel Mohanan Padi In Mukkuzhy Fs Under Pampa Range During 2025 26
Description
Cost Of Establishing Solar Power Fencing System From Kulangarapadi To Vadakkel Mohanan Padi In Mukkuzhy Fs Under Pampa Range During 2025 26
Organisation Forest Department | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 590
EMD 5125
Tender Value
Place Mukkuzhy FS in Pampa Range
Link

AAAAAAAAAA

Login to view
Start Date June 12, 2025 22:00
End Date

20/06/2025 ( 5 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Cwe/chm-26/2025-26 special repair to retaining wall from shakti dwar towards pine marg, mes ib and other technical areas under age b/r i of ge chandimandir at chandimandir mil station

Cwe/chm-26/2025-26 special repair to retaining wall from shakti dwar towards pine marg, mes ib and other technical areas under age b/r i of ge chandimandir at chandimandir mil station

Read more
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Read more
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)

Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)

Read more
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039

Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039

Read more
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Improvements to east coast road from km.136/905 (ganapathichettikulam) to km.150/535 (rajiv gandhi square) on nh-332a under annual plan 2025-26 in the ut of puducherry.

Improvements to east coast road from km.136/905 (ganapathichettikulam) to km.150/535 (rajiv gandhi square) on nh-332a under annual plan 2025-26 in the ut of puducherry.

Read more
Wbpwd/pw(r)/se/shc/nit no 07 of 2025-2026(sl-01)

Sonarpur-chekbaria road, from 0.00 km to 2.515 km, permanent restoration work damaged due to road cutting for laying of water supply pipe line under amrut 2.0 project under rajpur-sonarpur municipality, under south 24-parganas highway division in th

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more

Ge/chd/t-20/2025-26 repair to drain,path,fencing and compound wall in k area and sf accn at sec 28/29d under ge chandigarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise