Tender Details

Particulars Details
Title
Work Of Construction Of 07 Nos. Ventilation In B 1 Panel And 13 Nos Ventilation Stopping B 2 Panel (Fly Ash Bricks) Including All Materials Development District In Bws At Tawa 2 Mine, Pathakhera Area, Wcl.
Description
Work Of Construction Of 07 Nos. Ventilation In B 1 Panel And 13 Nos Ventilation Stopping B 2 Panel (Fly Ash Bricks) Including All Materials Development District In Bws At Tawa 2 Mine, Pathakhera Area, Wcl.
Organisation Western Coalfields Limited | Public Sector Undertakings
Tender Id 2025_WCL_324893_1
Reference
Number
PK3550-E-MIN-0047-2024-25
Tender Fee 0
EMD 15000
Tender Value
Place TAWA 2 MINE PATHAKHERA AREA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336779
Start Date January 05, 2025 22:30
End Date

15/01/2025 ( Expired 153 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Read more
Providing, installing and commissioning of 6 nos. submersible pump set with panel and submersible cable complete in all respect contingent thereto at tw no. 13 near grain market in samana district patiala

Providing, installing and commissioning of 6 nos. submersible pump set with panel and submersible cable complete in all respect contingent thereto at tw no. 13 near grain market in samana district patiala

Read more
Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs

Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs

Read more
Contractual work of transport and installation of a pony belt including structure, belting and tailend installation w5a panel in ug at chhatarpur mine no. 1 of pathakhera area.

Contractual work of transport and installation of a pony belt including structure, belting and tailend installation w5a panel in ug at chhatarpur mine no. 1 of pathakhera area.

Read more
Extension of 1000mm belt in underground at cm panel w7xcut proposed development panel of bagdona coal seam at tawa mine of wcl, pathakhera area.

Extension of 1000mm belt in underground at cm panel w7xcut proposed development panel of bagdona coal seam at tawa mine of wcl, pathakhera area.

Read more
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar

Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar

Read more
Job no. 65.2025 hewp mtc. of all hort. works of tree plants in green belt pocket no. 1 and 2 sec 25 central verge in sec 33 p-i and sec 14 p ii developed under urban forest at u.e. hisar

Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).

Read more
General-rm/2024-25- rc 2- phase 1- cluster ii- zone 13- one year running contract for various pwd roads under section malappuram in malappuram district- 4 nos of roads stretches for a length of 15.80 km,general civil work-general civil work

General-rm/2024-25- rc 2- phase 1- cluster ii- zone 13- one year running contract for various pwd roads under section malappuram in malappuram district- 4 nos of roads stretches for a length of 15.80 km,general civil work-general civil work

Read more
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Read more
Transport and installation of a pony belt including structure belting and tailend installation e panel in ug at chhatarpur mine no 1 of pathakhera area

Transport and installation of a pony belt including structure belting and tailend installation e panel in ug at chhatarpur mine no 1 of pathakhera area&#x0d &#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise