Tender Details
Particulars | Details |
---|---|
Title |
Work Of Construction Of 07 Nos. Ventilation In B 1 Panel And 13 Nos Ventilation Stopping B 2 Panel (Fly Ash Bricks) Including All Materials Development District In Bws At Tawa 2 Mine, Pathakhera Area, Wcl.
|
Description |
Work Of Construction Of 07 Nos. Ventilation In B 1 Panel And 13 Nos Ventilation Stopping B 2 Panel (Fly Ash Bricks) Including All Materials Development District In Bws At Tawa 2 Mine, Pathakhera Area, Wcl.
|
Organisation | Western Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_WCL_324893_1 |
Reference Number |
PK3550-E-MIN-0047-2024-25 |
Tender Fee | 0 |
EMD | 15000 |
Tender Value | |
Place | TAWA 2 MINE PATHAKHERA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336779 |
Start Date | January 05, 2025 22:30 |
End Date |
15/01/2025 ( Expired 120 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Read moreCleaning/removal of spill coal/fallen coal along all trunk belts and district belts of lower workable seam and bagdona seam at tawa-ii mine, pathakhera area, wcl
Cleaning/removal of spill coal/fallen coal along all trunk belts and district belts of lower workable seam and bagdona seam at tawa-ii mine, pathakhera area, wcl
Read moreSuppression of dust after blasting in faces in all running lhd depillaring panels and where required in bagdona seam at tawa mine of pathakhera area, wcl
Suppression of dust after blasting in faces in all running lhd depillaring panels and where required in bagdona seam at tawa mine of pathakhera area, wcl
Read moreTransport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Read moreRemoval of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Removal of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Read moreCleaning of spillage coal/shale along all running belts of bagdona seam and lower workable seam at tawa mine, pathakhera area, wcl
Cleaning of spillage coal/shale along all running belts of bagdona seam and lower workable seam at tawa mine, pathakhera area, wcl
Read moreDismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Dismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Read moreJob no. 48.2025 hewp mtc. of all hort works of shrub plants in green belt pocket no. 1 and 2 in sector 25 developed under urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreWork for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine
Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine
Read moreConstruction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Read moreof your Industry type