Tender Details
Particulars | Details |
---|---|
Title |
Pwb/Tno 4/Wno 1
|
Description |
Construction Of Cement Road And Side Gutter Along Old Aagra Road From P No 1 To 5 Near Supreme Tiles And Adjacent Gullies At Malegaon.&Amp#X0d
|
Organisation | Malegaon Municipal Corporation Malegaon | State Govt. and UT |
Tender Id | 2024_MMC_1086787_2 |
Reference Number |
MMC/PWB/TEN-4/24-25 |
Tender Fee | 3503 |
EMD | 29813 |
Tender Value | |
Place | Works |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1896746 |
Start Date | September 18, 2024 21:30 |
End Date |
26/09/2024 ( Expired 235 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreProvision upgradation for fire safety services of old hangar (bldg no. p-17), lightning test facility hangar (bldg no. p-19), avionics (bldg no. p-36), aew and c building (bldg no. p-67) and stir building (bldg no. p-1) at cabs, bangalore
Provision upgradation for fire safety services of old hangar (bldg no. p-17), lightning test facility hangar (bldg no. p-19), avionics (bldg no. p-36), aew and c building (bldg no. p-67) and stir building (bldg no. p-1) at cabs, bangalore
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreSpecial repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) meerut cantt
Special repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) 
 meerut cantt
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreConstruction work of bituminous road from gast ka tajiya to chapparwala pul zone no. 16 ward no. 35 file no. 14/25x3/5 kayakalp yojna
Construction work of bituminous road from gast ka tajiya to chapparwala pul zone no. 16 ward no. 35 file no. 14/25x3/5 kayakalp yojna
Read moreof your Industry type