Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Of Sewage Treatment Plants And Associated Infrastructure For Pt. Deen Dayal Upadhyay Nagar (Ddu Nagar), State Of Uttar Pradesh On Hybrid Annuity Model Basis Under Namami Gange Program
|
| Description |
Development Of Sewage Treatment Plants And Associated Infrastructure For Pt. Deen Dayal Upadhyay Nagar (Ddu Nagar), State Of Uttar Pradesh On Hybrid Annuity Model Basis Under Namami Gange Program
|
| Organisation | UP Jal Nigam Gra(HQ) Lucknow | State Govt. and UT |
| Tender Id | 2025_UPJNG_1051391_1 |
|
Reference Number |
364/M-2/45 dt 21.06.2025 |
| Tender Fee | 0 |
| EMD | 1.91 Crore |
| Tender Value | |
| Place | Pt. DDU Nagar, Chandauli |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1911116 |
| Start Date | July 28, 2025 14:30 |
| End Date |
Expired
04/09/2025
Expired 274 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreInterception and di (i and d) and stp works at lucknow, phase-ii part-2, uttar-pradesh state, including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Interception and di (i and d) and stp works at lucknow, phase-ii part-2, uttar-pradesh state, including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreSitc of plc based centrilized fully automatic bacteriological treatment plant at pt. deen dayal upadhyay govt. model inter college kuradeeh pratapgarh
Sitc of plc based centrilized fully automatic bacteriological treatment plant at pt. deen dayal upadhyay govt. model inter college kuradeeh pratapgarh
Read moreConstruction of safe drinking water under allankar yojna at pt. deen dayal upadhyay gic model badhai kalan muzaffarnagar
Construction of safe drinking water under allankar yojna at pt. deen dayal upadhyay gic model badhai kalan muzaffarnagar
Read moreSewage treatment plant of capacity 300kld based on johkasou technology at ganga vatika dhalwala tehri garhwal under namami gange programme
Sewage treatment plant of capacity 300kld based on johkasou technology at ganga vatika dhalwala tehri garhwal under namami gange programme
Read moreAppointment of safety consultant for development of ropeway from varanasi cantt to godowlia chowk in the state of uttar pradesh on hybrid annuity mode.
Appointment of safety consultant for development of ropeway from varanasi cantt to godowlia chowk in the state of uttar pradesh on hybrid annuity mode.
Read moreDevelopment of 60 mld sea water desalination plant at village mullakadu in tuticorin district tamilnadu on hybrid annuity model (ham), ppp basis
Development of 60 mld sea water desalination plant at village mullakadu in tuticorin district tamilnadu on hybrid annuity model (ham), ppp basis
Read moreDevelopment, operation and maintenance of ropeway between shankar viman mandapam and triveni pushp at prayagraj in the state of uttar pradesh on hybrid annuity mode.
Development, operation and maintenance of ropeway between shankar viman mandapam and triveni pushp at prayagraj in the state of uttar pradesh on hybrid annuity mode.
Read moreIndependent engineer services for supervision of development, operation and maintenance of ropeway between shankar viman mandapam and triveni pushp at prayagraj in the state of uttar pradesh on hybrid annuity mode
Independent engineer services for supervision of development, operation and maintenance of ropeway between shankar viman mandapam and triveni pushp at prayagraj in the state of uttar pradesh on hybrid annuity mode
Read moreConstruction of raebareli ring road phase-ii with four lane configurations (design length 21.888 km) for rae-bareli city in the state of uttar pradesh on hybrid annuity model (ham) basis
Construction of raebareli ring road phase-ii with four lane configurations (design length 21.888 km) for rae-bareli city in the state of uttar pradesh on hybrid annuity model (ham) basis
Read moreof your Industry type