Tender Details
Particulars | Details |
---|---|
Title |
Extension of boundary wall at 220/66kv gis phyang for green energy corridor phase-ii,ists for evacuation of 13gw renewable energy project
|
Description |
Extension of boundary wall at 220/66kv gis phyang for green energy corridor phase-ii,ists for evacuation of 13gw renewable energy project
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.24 Lakh |
Tender Value | |
Place | 220/66KV GIS Phyang for Green Energy Corridor Phase |
Link |
AAAAAAAAAA Login to view |
End Date |
27/09/2024 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of licensor for supply of know-how/technology, basic engineering design package , dwc internals and other services for divided wall column application in naphtha finishing unit at pdr
Selection of licensor for supply of know-how/technology, basic engineering design package , dwc internals and other services for divided wall column application in naphtha finishing unit at pdr
Read morePainting of office buildings and boundary wall of ss and ts at 765/400/220 kv wardha substation
Painting of office buildings and boundary wall of ss and ts at 765/400/220 kv wardha substation
Read moreSpl repair to breach of approx 50 ft in boundary wall at lamayuru, spl repair to bldg at biamah and spl repair e/m ( re-wiring) to various bldg at achinathang under the aor of age b/r-ii khaltsi under ge khumbathang
Spl repair to breach of approx 50 ft in boundary wall at lamayuru, spl repair to bldg at biamah and spl repair e/m ( re-wiring) to various bldg at achinathang under the aor of age b/r-ii khaltsi under ge khumbathang
Read moreArm of boundary wall, compound wall and fort wall for the year 2024-25 at 22nd bn itb police tigri camp new delhi
Arm of boundary wall, compound wall and fort wall for the year 2024-25 at 22nd bn itb police tigri camp new delhi
Read moreProvn of boundary wall (300 m) for rwa under age b/r-i at ge jhansi
Provn of boundary wall (300 m) for rwa under age b/r-i at ge jhansi
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for lilo of ckt no. 1 of 220 kv rsd sarna line at 220 kv shahpur kandi power house-i to power house-ii (from tl no. 49-56) sc on dc line
Laying of tower foundations, erection of towers, stringing and sagging of conductor for lilo of ckt no. 1 of 220 kv rsd sarna line at 220 kv shahpur kandi power house-i to power house-ii (from tl no. 49-56) sc on dc line
Read moreRepairs to drains boundary wall fencing and hard standing at trishul lines mes ib under age b r n no ii of ge north secunderabad
Repairs to drains boundary wall fencing and hard standing at trishul lines mes ib under age b r n no ii of ge north secunderabad
Read moreDesign manufacture supply installation testing and commissioning of heavy duty escalators for cmrl phase ii corridor 5 (from madhavaram depot metro to koyambedu metro stations).
Design manufacture supply installation testing and commissioning of heavy duty escalators for cmrl phase ii corridor 5 (from madhavaram depot metro to koyambedu metro stations).
Read moreAluminum and copper power cables of various sizes for use at valuthur gas turbine power station-phase-ii
Aluminum and copper power cables of various sizes for use at valuthur gas turbine power station-phase-ii
Read moreEngineering, procurement and construction for provision of otm accn for 58 bedded hospital (phase-i of two phases) of military hospital at military station kota
Engineering, procurement and construction for provision of otm accn for 58 bedded hospital (phase-i of two phases) of military hospital at military station kota
Read moreNo attachments found
of your Industry type