Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Drager Tubes Cyanide 2/A (Multigas Detector Tubes)
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2024/B/4797379 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 18, 2024 20:54 |
| End Date |
Expired
28/03/2024
Expired 883 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
HORIZON
9917
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | HORIZON | Make : DRAEGER Model : DRAGER TUBES CYANIDE 2/a, P/NO: 6728791 Title : DRAGER TUBES CYANIDE 2/a, P/NO: 6728791 | 27-03-2024 17:21:51 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | HORIZON | Item Categories : DRAGER TUBES CYANIDE 2/a (MULTIGAS DETECTOR TUBES) | 9917.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| DRAGER TUBES CYANIDE 2/a, P/NO: 6728791 | DRAEGER | DRAGER TUBES CYANIDE 2/a, P/NO: 6728791 | 1 | ₹ 9917.000 |
Group- a radiology 64 detector 128 slice ct scan high end ultrasound machine
Group- a radiology 64 detector 128 slice ct scan high end ultrasound machine
Read moreRtps dmeter survey & replacement of eroded boiler tubes during overhaul and associated works of units 2 to 4 boilers of rtps (oh-3)
Rtps d-meter survey & replacement of eroded boiler tubes during overhaul and associated works of units 2 to 4 boilers of rtps (oh-3)
Read moreCamc of 2 nos of vip lifts & 2 nos of freight lifts of unit 5 to 8 in rtps for a period of one year
Camc of 2 nos of vip lifts & 2 nos of freight lifts of unit 5 to 8 in rtps for a period of one year
Read moreComprehensive maintenance of internal wiring and fiting fixtures at pocket no 2 (units) to 4 and 16 to 21 under ge (a) jaisalmer
Comprehensive maintenance of internal wiring and fiting fixtures at pocket no 2 (units) to 4 and 16 to 21 under ge (a) jaisalmer
Read moreSelection of a service provider for the operation and maintenance of the (transport nagar mourang parking no- 5, 6, 7, 8 and 9 (group-2) in lmc) parking
Selection of a service provider for the operation and maintenance of the (transport nagar mourang parking no- 5, 6, 7, 8 and 9 (group-2) in lmc) parking
Read morePeriodical assistance for the various works of warehouse no 1 2 3 c go down diesel bunk scrap yard cpri bhel stores building and other storage area for a period of 12 months
Periodical assistance for the various works of warehouse no 1,2,3, c-go down, diesel bunk, scrap yard ,cpri, bhel stores building and other storage area for a period of 12 months
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type