Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Spares For Wpil Limited Make Vertical Turbine Pump
|
| Description |
Supply Of Spares For Wpil Limited Make Vertical Turbine (Vt) Pump (Model 16.5 X8 Fab) For Waste Heat Recovery Plant Of Lakwa Thermal Power Station (Ltps), Apgcl, Maibella.
|
| Organisation | Assam Power Generation Company Limited | State Govt. and UT |
| Tender Id | 2025_APGCL_45253_1 |
|
Reference Number |
APGCL/CGM (Gen)/2025-26/Spares of Raw Water Pump-LTPS/12 |
| Tender Fee | 500 |
| EMD | 32000 |
| Tender Value | - |
| Place | Lakwa Thermal Power Station |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=71614 |
| Start Date | July 01, 2025 15:30 |
| End Date |
Expired
06/08/2025
Expired 437 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Single stage, vertical, back pressure steam turbine
Supply, erection and commissioning of single stage, vertical, back pressure steam turbine
Read moreProcurement of spares for rfccu mab dhds rgc turbine
Procurement of spares for rfccu mab dhds rgc turbine
Read moreSpares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read morePocurement of sanmar nrv valve spares for condensete system at turbine
Pocurement of sanmar nrv valve spares for condensete system at turbinest 1 ntpc lara
Read moreRepair/ re conditioning of damaged/worn out turbine spares of vugph.
Repair/ re conditioning of damaged/worn out turbine spares of vugph as outlined in section 7 of the tender document
Read moreProcurement of spares for hp turbine for coh of 250mw kwu turbine set of unit no. 11, stps, mppgcl, sarni.
Procurement of spares for hp turbine for coh of 250mw kwu turbine set of unit no. 11, stps, mppgcl, sarni.
Read moreProcurement of turbine spares for unit#5 overhauling in feb2027under tm dept
Procurement of turbine spares for unit#5 overhauling in feb2027under tm dept
Read moreProcurement of asco make sov and spares used in ahp boiler and turbine
Procurement of asco make sov and spares used in ahp boiler and turbineof ntpc tanda
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreProcurement of balancing weight and other spares for main turbine at stg-ii, sgtpp.
Procurement of balancing weight and other spares for main turbine at stg-ii, sgtpp.
Read moreof your Industry type