Tender Details

Particulars Details
Title
Execution Of Electrical (Gen.) Portion Of Work For Construction Of Rub At Lc Nos.380, 382, 386, 395 And 399 In Bilaspur Durg Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79352383
Reference
Number
DyCEE-GSU-R-T-03-24-25
Tender Fee 0
EMD 88900
Tender Value
Place Bilaspur
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79352383/viewNitPdf_4823271.pdf
Start Date January 17, 2025 21:55
End Date

19/02/2025 ( Expired 116 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.

Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise