Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit Iv Boiler Pressure Parts Aoh 2025 Maintenance Of Various Sizes Of Hanger In Critical Pipe Lines And Allied Works
|
| Description |
Mtps I Bm Unit Iv Boiler Pressure Parts Aoh 2025 Maintenance Of Various Sizes Of Hanger In Critical Pipe Lines And Allied Works
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_586503_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.180 / 2025-26 |
| Tender Fee | 0 |
| EMD | 2700 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=700585 |
| Start Date | July 28, 2025 23:00 |
| End Date |
Expired
11/08/2025
Expired 435 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit v overhauling of load hangers of critical pipe lines headers of boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v overhauling of load hangers of critical pipe lines headers of boiler during overhaul for the year 2026 2027
Read moreMtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Read moreTtps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027
Read moreTtps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Read moreService contract for oh of boiler pr. parts (unit #5) and replacement of platen superheater coil (29 nos) under capex 24-25 during unit#5 oh under bm.
Service contract for oh of boiler pr. parts (unit #5) and replacement of platen superheater coil (29 nos) under capex 24-25 during unit#5 oh under bm.
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreTtps mech ii bm unit v renewal of worn out cladding sheet plastering insulation from the critical pipe lines repacking of insulation wool plastering cladding at various locations from 8 m level to 54 m level and painting of condensate storage tank ou
Ttps mech ii bm unit v renewal of worn out cladding sheet plastering insulation from the critical pipe lines repacking of insulation wool plastering cladding at various locations from 8 m level to 54 m level and painting of condensate storage tank ou
Read moreof your Industry type