Tender Details

Particulars Details
Title
Agc Integration And Ramp Rate In Abt System Of Ntpc Gadarwara
Description
Agc Integration And Ramp Rate In Abt System Of Ntpc Gadarwara
Organisation NTPC Limited(NTPC)
Tender Id 2023_NTPC_80781_1
Reference
Number
NTPC/Gadarwara STPP/9900267665
Tender Fee 0
EMD 0
Tender Value
Place Gadarwara STPP
Link
View Original Tender Notice

https://eprocurentpc.nic.in

Start Date October 25, 2023 18:50
End Date
Expired 06/11/2023

Expired 989 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines

Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc

Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc

Read more
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Licensing of co-branding and inside advertising rights of nine no. metro stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in upmrc network.

Licensing of co-branding and inside advertising rights of nine no. metro &#x0d stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in &#x0d upmrc network.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise