Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Non Viable Eight Stage Cascade Impactor
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/5042013 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 14, 2024 15:47 |
| End Date |
Expired
05/07/2024
Expired 834 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | INFOTECH ENGINEERING SERVICES | Make : INFOTECH ENGINEERING SERVICES Model : Standard Title : Non-Viable Eight Stage Cascade Impactor | 04-07-2024 10:32:11 | MSE | MII MSE | Qualified |
| 2 | M & G ANALYSER SYSTEMS | Make : TISCH ENVIRONMENTAL Model : TE-20-800- CDX. Title : Non-Viable Eight Stage Cascade Impactor | 05-07-2024 07:11:25 | Offline upload | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | M & G ANALYSER SYSTEMS | Item Categories : Non-Viable Eight Stage Cascade Impactor | 3187210.68 | L1 |
| 2 | INFOTECH ENGINEERING SERVICES (MSE,MII)( MSE Social Category:General ) | Item Categories : Non-Viable Eight Stage Cascade Impactor | 3848924.00 | L2 |
Cascade impactor inlet,slotted collection substrates quartz
Cascade impactor inlet,slotted collection substrates quartz
Read moreProcurement of non sparking tools for h2 feeding station of stage i, stage ii and stage iii operation, sgtpp.
Procurement of non sparking tools for h2 feeding station of stage i, stage ii and stage iii operation, sgtpp.
Read moreMulti process trainer for flow level cascade feed forward and ratio control,non linear level control trainer,continuous stirred tank reactor,two cstrs and one pfr,cascade of cstrs,mass transfer with or without chemical reaction,simple distillation unit,microwave reactor
Multi process trainer for flow level cascade feed forward and ratio control,non linear level control trainer,continuous stirred tank reactor,two cstrs and one pfr,cascade of cstrs,mass transfer with or without chemical reaction,simple distillation unit,microwave reactor
Read more-86 deg c ultra low temperature deep freezer with cascade refrigeration system
-86 deg c ultra low temperature deep freezer with cascade refrigeration system
Read more1.99900001220 eight seater steel frame dining table
1.99900001220 eight seater steel frame dining table
Read moreConstruction of eight security post foundation with material
Construction of eight security post foundation with material for 540 mw 02x270mw thermal power unit of gvk pgsl goindwal sahib
Read more6 sq.mm thin walled flex.elast.cable of eight types.
6 sq.mm thin walled flex.elast.cable of eight types.
Read moreEight inch gloves for radiological operations inside the glove boxes
Eight inch gloves for radiological operations inside the glove boxes
Read moreof your Industry type