Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
๐ Procurement Opportunity: Maintenance Team For Access Network ๐ง๐ The Rail Tel Corporation Of India Ltd, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Reputable Service Providers For The Deployment Of A Maintenance Team. The Team Will Be Responsible For The Privatized Maintenance And Fault Rectification Of Underground (U/G) And Aerial Optical Fiber Cable (Ofc) For Access Network, With A Contract Duration Of Two Years. ๐ Bid Submission Deadline: April 12, 2024, 3:00 Pm A Tender Fee Of Inr 81,900 Is Applicable, With An Earnest Money Deposit (Emd) Of The Same Amount. Interested Parties Must Submit Detailed Proposals, Including Their Technical Capabilities, Experience, And Financial Bids, As Per The Tender Document Guidelines. Keywords: Maintenance Team, Access Network, Ofc, Rail Tel Corporation Of India Ltd, Central Government, Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Deployment Of Maintenance Team For Prive Maintenance And Fault Rectification Of Access Network I.E. U/G And Aerial Ofc For A Period Of Two Years
|
Description |
Deployment Of Maintenance Team For Prive Maintenance And Fault Rectification Of Access Network I.E. U/G And Aerial Ofc For A Period Of Two Years
|
Organisation | Rail Tel Corporation of India Ltd | Central Govt. Ministry/Department |
Tender Id | 2024_RTCIL_751332_1 |
Reference Number |
RailTel/e-Tender/OT/ SR/ SC/2023-24/60 |
Tender Fee | 0 |
EMD | 81900 |
Tender Value | |
Place | As per Tender Document |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1054604 |
Start Date | March 22, 2024 16:35 |
End Date |
12/04/2024 ( Expired 428 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreDeployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreof your Industry type