Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Restoration Of Damaged Pucca Dowel Between Rd 1940 M To 17500 M On L/S Of Anandpur Sahib Hydel Channel For The Year 2023 24
|
| Description |
Restoration Of Damaged Pucca Dowel Between Rd 1940 M To 17500 M
On L/S Of Anandpur Sahib Hydel Channel For The Year 2023 24.
|
| Organisation | Government of Punjab |
| Tender Id | 2023_POWER_103179_1 |
|
Reference Number |
Tender Enquiry No. 04/Sr. Xen/Civil/AHC/2023-24 |
| Tender Fee | 1180 |
| EMD | 12300 |
| Tender Value | |
| Place | Ganguwal, Distt. Rupnagar - 140123 |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in |
| Start Date | May 30, 2023 16:40 |
| End Date |
Expired
26/06/2023
Expired 1095 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement of fatehgarh chuiran dera baba nanak road at rd 0.90 to 1.084 r.h.s. in district for the year 2026-27
Improvement of fatehgarh chuiran dera baba nanak road at rd 0.90 to 1.084 r.h.s. in district for the year 2026-27
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreClearance of sewage waste and muck/gravel from ganda nala between rd 10010 m and 10355 m and ganda nala b/w rd 1670 m to 1940 m along the left bank of anandpur sahib hydel channel for the year 2023-24.
Clearance of sewage waste and muck/gravel from ganda nala between rd 10010 m and 10355 m and ganda nala b/w rd 1670 m to 1940 m along the left bank of anandpur sahib hydel channel for the year 2023-24.
Read moreRestoration of damaged cc lining slabs in between rd 0 m to rd 602 m on both sides of mhc-ii during the year 2023-24
Restoration of damaged cc lining slabs in between rd 0 m to rd 602 m on both sides of mhc-ii during the year 2023-24
Read moreRestoration of damaged stone pitching on various locations of ubdc hydel channel from rd 0ft to rd 65640ft
Restoration of damaged stone pitching on various locations of ubdc hydel channel from rd 0ft to rd 65640f
Read moreClearance of muck/gravel from u/s portion of khad, barrel , d/s of superpassage at rd 5819 m, rd 6360 m, rd 7295 m etc including painting of gauges of these superpassages of anandpur sahib hydel canal under ahc sub division, nangal for year 2023-24
Clearance of muck/gravel from u/s portion of khad, barrel , d/s of superpassage at rd 5819 m, rd 6360 m, rd 7295 m etc including painting of gauges of these superpassages of anandpur sahib hydel canal under ahc sub division, nangal for year 2023-24
Read moreClearance of muck/gravel from u/s portion of khad, barrel , d/s of superpassage at rd 5819 m, rd 6360 m, rd 7295 m etc including painting of gauges of these superpassages of anandpur sahib hydel canal under ahc sub division, nangal for year 2023-24
Clearance of muck/gravel from u/s portion of khad, barrel, d/s of superpassage at rd 5819 m, rd 6360 m, rd 7295 m etc including painting of gauges of these superpassages of anandpur sahib hydel canal under ahc sub division, nangal for year 2023-24
Read moreRestoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Restoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Read moreRestoration of damaged cc lining slabs in between rd 2975 m to rd 3800 m on both sides of mhc-ii during the year 2025-26
Restoration of damaged cc lining slabs in between rd 2975 m to rd 3800 m on both sides of mhc-ii during the year 2025-26
Read moreRestoration of damaged chutes and side drain at inspection bank in between rd 35500 m to rd 34655 m on b/s mhc-i during the year 2025-26
Restoration of damaged chutes and side&#x0d drain at inspection bank in between rd 35500 m to rd 34655 m on b/s&#x0d mhc-i during the year 2025-26
Read moreof your Industry type