Tender Details

Particulars Details
Title
Dismantling, Shifting, Reinstallation, Commissioning And Stamping Of 01 No. 100 Te Capacity Road Weighbridge From Bartunga Hill Mine To Chirimiri Ocm At Chirimiri Area
Description
Dismantling, Shifting, Reinstallation, Commissioning And Stamping Of 01 No. 100 Te Capacity Road Weighbridge From Bartunga Hill Mine To Chirimiri Ocm At Chirimiri Area
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_331359_1
Reference
Number
SECL/GM/CHRM/EM/e-Tender/ 24-25/57 dtd. 05.03.2025
Tender Fee 0
EMD 0
Tender Value
Place Chirimiri Sub Area, Chirimiri Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343466
Start Date March 06, 2025 15:30
End Date

13/03/2025 ( Expired 93 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Supply of bread (white) and bread (wheatmeal) at sup depot ferozepur for the period from 01 oct 2025 to 30 sep 2026

Supply of bread (white) and bread (wheatmeal) at sup depot ferozepur for the period from 01 oct 2025 to 30 sep 2026

Read more
Construction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41

Construction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41

Read more
Special repair to building no p-3/83 (01 to 08) and p-3/84 (05 to 08) or md accn of med regt at mil stn jammu under ge satwari

Special repair to building no p-3/83 (01 to 08) and p-3/84&#x0d (05 to 08) or md accn of med regt at mil stn jammu&#x0d under ge satwari

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise