Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Overhauling Service Repair Of Air Conditioner Split Type 2 Ton; Repair Of Air Conditio
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5557677 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 29, 2024 17:41 |
| End Date |
Expired
11/11/2024
Expired 699 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Read moreAmc services of split acs at ocp3, rg2 for a period of three years.
Amc services of split acs at ocp3, rg2 for a period of three years.
Read moreProcurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.
Procurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.
Read moreTggenco-ktps vii stage/paloncha - supply of split ac spares for various plc room locations
Tggenco-ktps vii stage/paloncha - supply of split ac spares for various plc room locations
Read moreSpares for m/s wpil makes horizontal split case pump of model:10ln26a at kataram booster pump house
Spares for m/s wpil makes horizontal split case pump of model:10ln26a at kataram booster pump house
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreAward of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Award of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Read moreSupply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))
Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreof your Industry type