Tender Details

Particulars Details
Title
03/Nit/Ce Cum Ed/Halpz/Ee/Halpd Ii/2024 25
Description
Construction Of Various Industrial Buildings For New Helicopter Manufacturing Facility For Hindustan Aeronautics Limited At Biderahalla Kaval, Gubbi Taluk, Tumakuru District Under Phase I Stage Iii Sh: Design And Execution Of Automated Irrigation System, Design And Construction Of Rcc Ug Sewage Collection Sump I/C Piping Network, Steel Staircase, Chain Link Fencing Works, Supply And Installation Of Eye Wash Units, Automatic High Speed Industrial Fabric Doors, Internal And External Power Distribution System And Other Miscellaneous Works.
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 90050
Reference
Number
03/NIT/CE cum-ED/HALPZ/EE/HALPD-II/2024-25
Tender Fee 0
EMD 4.81 Lakh
Tender Value
Place
Link
View Original Tender Notice

https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642439303035302430332f4e49542f43452063756d2d45442f48414c505a2f45452f48414c50442d49492f323032342d3235

Start Date October 01, 2024 02:44
End Date
Expired 09/10/2024

Expired 607 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
04/ee/iiser pd-i-05/ce cum ed/tpz/tirupati/2026-27

Additional facility services of hazardous chemistry lab building (ground floor) in epc mode-i (design and build basis) including internal water supply, sanitary installations, drainage, furniture, fume hoods, firefighting system, hvac installations, internal electrical installations, bulk services, etc., at iiser tirupati, jangalapalli village, yerpedu mandal, tirupati district, andhra pradesh.

Read more

Planning, designing and construction of national centre for disease control (ncdc) state branch building (g plus 2) (civil , eandm and all other works) comprising biosafety level-2 (bsl-2) laboratory, office space and associated facilities including comprehensive consultancy services, site development works, specialized eandm works and mep services, laboratory furniture and office furniture at national tuberculosis institute (nti) campus, bengaluru, karnataka, integration of all works and services for setting up of the ncdc state branch building, making fit for occupation, all complete on engineering, procurement and construction (epc) basis (package 01)

Read more

Resuscitation of nandarampur-santoshpur suti khal for a length of 4440 m including necessary protection work within chingripota gram panchayet and uttar raypur gram panchayat of block budge budge- i, p.s.-budge budge, dist. south 24 parganas.

Read more

Construction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 2 nos. company level bop at simna-ii and old sewaram para including internal electrification, installation i/c compound lights service connecton to buildings. (package-ii) (balance work)

Read more

Anti_termite treatment to the ground floor and 8th floor of main building within sales tax complex under the dte. of commercial taxes, w.b. at 14, beliaghata road ,kolkata 700015

Read more

Thorough repair and renovation of department of anatomy at kolkata medical college and hospital.

Read more

Boring of 08 nos. deep tubewell in jangpura constituency under ee-(c)-29 (ac-41).

Read more
34/08/nit/ae-ii/ee-kol-iii/cpwd/2026-2027

Fully upgradation work in (2 nos) type-ii quarters (qtr no 422,394) of af block in old new campus cpwd qtrs salt lake, kolkata as per cpwdsewa complaint basis during 2026-27.

Read more
03/nit/ce cum-ed/halpz/ee/halpd-ii/2024-25 (2nd call)

Construction of various industrial buildings for new helicopter manufacturing facility for hindustan aeronautics limited at bidrehalla kaval, gubbi taluk, tumakuru district under phase-i, stage-iii. sh: design and execution of automated irrigation system, design and construction of rcc ug sewage collection sump i/c piping network, steel staircase, chain link fencing works, supply and installation of eye wash units, automatic high speed industrial fabric doors, internal and external power distribution system and other miscellaneous works.

Read more
02/ee-halpd-ii/ce-cum-ed/hal/gubbi/2025-26

Infrastructure development for new helicopter manufacturing facility for hindustan aeronautics limited at biderahalla kaval gubbi taluk tumkur dist under phase 1 stage 3 sh : balance works of residual works of stage 3 such as construction of gate complex g11 develoment parking facilities near g11 construction of dust proof enclosure and control cabins and construction of addiotnal boundary wall near g11 and other additonal works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise