Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Hathi Passage (Overpass ; 55.0 M Wide, Span 1 X 52.535m Composite Girder) For Movement Of Elephant At Km: 500/15 17 Between Dhutra And Bagdehi In Rourkela Jharsuguda Section & (Overpass; 55.0 M Wide, Span 1 X 52.36m & 1 X 36.0m Composite Girder) For Movement Of Elephant At Km: 405/5 10 Between Banspani And Jaroli In Dangoaposi Jaroli Section Of Odisha State In Chakradharpur Division In South Eastern Railway
|
| Description |
Construction Of Hathi Passage (Overpass ; 55.0 M Wide, Span 1 X 52.535m Composite Girder) For Movement Of Elephant At Km: 500/15 17 Between Dhutra And Bagdehi In Rourkela Jharsuguda Section & (Overpass; 55.0 M Wide, Span 1 X 52.36m & 1 X 36.0m Composite Girder) For Movement Of Elephant At Km: 405/5 10 Between Banspani And Jaroli In Dangoaposi Jaroli Section Of Odisha State In Chakradharpur Division In South Eastern Railway
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 15, 2026 00:32 |
| End Date |
Open
12/11/2026
27 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreDnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)
Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)
Read moreConstruction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.
Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.
Read morePeriodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.
Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read more1) hemoclip rotatable should be a) pre-loaded ready to use b) multiple times reopening capability c) wide jaw span greater than and equal to 16mm d) length 150 to 200cm and 360 degree rotation and 1:1 movement, 2) injection gold probe consists of : a) 7fr injection gold probe combined with sclerotherapy needle and firm catheter shaft b) should have separate irrigation channel, compatible with a 2.8mm working channel c) working length more than 160cm and have a ceramic and gold tip, 3) hemospra
1) hemoclip rotatable should be a) pre-loaded ready to use b) multiple times reopening capability c) wide jaw span greater than and equal to 16mm d) length 150 to 200cm and 360 degree rotation and 1:1 movement, 2) injection gold probe consists of : a) 7fr injection gold probe combined with sclerotherapy needle and firm catheter shaft b) should have separate irrigation channel, compatible with a 2.8mm working channel c) working length more than 160cm and have a ceramic and gold tip, 3) hemospra
Read moreBalance work of 3 nos. major bridges in rcc substructure for bridge no. 166 span (10x30.50 m composite girder), br. no. 168 span (6x30.50 m composite girder) & br. no. 171 span (8x30.5m composite girder) and construction of 6 nos. major bridges on pile foundation in rcc substructure & superstructure as per rdso s drawing for br. no. 175 span (1x30.50 m composite girder), br. no. 179 span (1x30.50 m composite girder), br. no. 181 span (1x18.30 m composite girder), br. no. 183 span
For complete deion and other details, please refer to tender
Read moreDoubling of track between thiruvananthapuram and kanyakumari stations- proposed reconstruction of rob no.72 as 1x48000m clear span bow string steel girder at ch:237794 at nyy yard, aqueduct no. 93 as 1x24000mm effective span composite girder at ch: 243300, rob 94 as 1x24000mm effective span composite girder at ch: 243334, rob 99 as 1x36000mm effective span composite girder at ch: 244335, rob 120 as 1x36000mm effective span composite girder at ch: 247912, rob 125 as 1x36000mm effective span com
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge of span 1 x 56.0m bow string girder 1x 36.0m composite girder 1x 24.0m composite girder with rcc deck slab at rly. km.337/35-37 & limited height subway(lhs) of size 4.00x3.00m at rly.km.337/29-31 in lieu of lc.no. 142 between jjkr-jkpr section on howrah - chennai main line under khurda road division
For complete deion and other details, please refer to tender