Tender Details
Particulars | Details |
---|---|
Title |
Providing Chain Fencing, Repairing And Construction Of Steps At U/S Line At Site Kuniyil Under Csd, Cwc, Kozhikode
|
Description |
Providing Chain Fencing, Repairing And Construction Of Steps At U/S Line At Site Kuniyil Under Csd, Cwc, Kozhikode
|
Organisation | Central Water Commission | Central Govt. Ministry/Department |
Tender Id | 2024_CWC_741065_1 |
Reference Number |
SWRD/HQS/259(1)/2020/63 DATED 09.01.2024 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Kuniyil |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1044085 |
Start Date | January 09, 2024 23:20 |
End Date |
17/01/2024 ( Expired 513 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreRepair/resurfacing of road, road furniture, road marking, rcc bollard etc and sign board at tb-ii and dunkirk line under age b/r-ii in ge (c) khadki
Repair/resurfacing of road, road furniture, road marking, rcc bollard etc and sign board at tb-ii and dunkirk line under age b/r-ii in ge (c) khadki
Read moreRepair/maint of ht 11 kv transformer ,god ,vcb , rmu,overhead line,under ground cable and other connected works at af station gorakhpur
Repair/maint of ht 11 kv transformer ,god ,vcb , rmu,overhead line,under ground cable and other connected works at af station gorakhpur
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreConstruction of cc road and u shape drain at ward no. 2 in different street
Construction of cc road and u shape drain at ward no. 2 in different street
Read moreof your Industry type