Tender Details

Particulars Details
Title
Watershed Development Works Community Johad 02, Community 08, Niji Tanka 10 (Total 20 Nos.)
Description
Watershed Development Works Community Johad 02, Community 08, Niji Tanka 10 (Total 20 Nos.)
Organisation Deptt. of Watershed Dev. and Soil Conservation | State Govt. and UT
Tender Id 2024_WDSC_385038_1
Reference
Number
ENIT_7_2023_24_SE_CHURU_3
Tender Fee 2500
EMD 1.32 Lakh
Tender Value
Place Ratangarh
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=685959

Start Date March 01, 2024 15:30
End Date
Expired 07/03/2024

Expired 821 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders

Construction of school building (g plus 1) covered courtyard at jawahar navodaya vidyalaya, arong village, car nicobar. sh-1:- building portion including internal water supply, sanitary installations, drainage, development works and other miscellaneous works. sh-2:- internal electrical installation and fire fighting system.

Read more
Kmda/housing / se/cir-ii (kit wing) /nit-02/2026-2027

Construction of community centre with electrification and all infrastructure works at poddar park tenament scheme premises no. 420/1, p.a. shah road, kolkata- 700045 under housing sector, kmda

Read more
Installation of new lifts replacing the old lifts in mayukh bhawan salt lake kolkata-91----sitc of 02 nos. g plus 4 08 passenger mrl lifts

Installation of new lifts replacing the old lifts in mayukh bhawan salt lake kolkata-91----sitc of 02 nos. g plus 4 08 passenger mrl lifts

Read more
Under the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.

Under the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.

Read more
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w

Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w

Read more

Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters other development works. (electrical and mechanical installations): package c1: providing internal e1, c2: providing fire alarm system, c3: providing fire fighting system, c4: providing cctv, c5: providing 3 nos 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providng networking, (agrement no. 32/ee(puducherry)/cpwd/2023-24) sub head: risk cost under clause 14 for providing and fixing of fire door.

Read more
05/ee(e)(puducherry)/cpwd/2026-27 - recall 1

Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters and other development works. (electrical and mechanical installation): package c1: providing internal ei, c2: providing fire alarm system, c3: providing firefighting system, c4: providing cctv, c5: providing 3 nos. 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providing network, (agreement no.32/ee(puducherry)/cpwd/2023-24) sub head: risk and cost under clause 14 for providing 2nos. 13 passenger lift.

Read more
Watershed development works niji tanka 10, community tanka 09, farm pound 04 (total 23 nos.)

Watershed development works niji tanka 10, community tanka 09, farm pound 04 (total 23 nos.)

Read more
Watershed development works tanka 06, community johad 02, farm pound 10 (total 18 nos.)

Watershed development works tanka 06, community johad 02, farm pound 10 (total 18 nos.)

Read more
Watershed development works individual tanka 1, pakka johad 1, community tana 1, community rtwhs 1 (total 04 nos.)

Watershed development works individual tanka 1, pakka johad 1, community tana 1, community rtwhs 1 (total 04 nos.)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise