Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Distilled Water Treatment Plant For Indian Railways 🚂 The Ministry Of Railways, Central Government, Invites Tenders For The Supply, Erection, And Commissioning Of A Distilled Water Treatment Plant. 💧 The Plant Is Specifically Designed For The Maintenance Of Battery Schedules For 30 Electric Locos, Including The Necessary Pre Filtration Filters. 🛠️ Tender Submission Deadline: June 19, 2024, 11:30 Am Interested Bidders Are Requested To Review The Complete Tender Documents For Detailed Specifications, Terms, And Conditions. Keywords: Distilled Water Treatment Plant, Electric Locos, Battery Schedule Maintenance, Ministry Of Railways, Central Government, Tender, Camc, Gorakhpur| Particulars | Details |
|---|---|
| Title |
Supply, Erection & Commissioning Of Distilled Water Treatment Plant Suitable For Electric Locos Battery Schedule Maintenance Including Of 30 Nos. Filter For Pre Filtration To Be Supplied Along With The System 30 Months Camc After Warranty Period 24 Months.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106291413 |
|
Reference Number |
14245173 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Gorakhpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106361579/viewNitPdf_4589038.pdf |
| Start Date | May 30, 2024 18:38 |
| End Date |
Expired
19/06/2024
Expired 852 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Metal cutting gas:- bmcg supplied by m/s bharat petroleum corporation limited or nano- cut gas supplied by m/s indian oil corporation limited or hp gas razor supplied by m/s hindustan petroleum corporation limited. [ warranty period: 30 months after the date of delivery ]
Metal cutting gas:- bmcg supplied by m/s bharat petroleum corporation limited or nano- cut gas supplied by m/s indian oil corporation limited or hp gas razor supplied by m/s hindustan petroleum corporation limited. [ warranty period: 30 months after the date of delivery ]
Read moreSitc 40 kva ups vtz lab,camc of ups post warranty quarterwise year1 vtz,camc of ups post warranty quarterwise year2 vtz,camc of ups post warranty quarterwise year3 vtz,camc of ups post warranty quarterwise year4 vtz,camc of ups post warranty quarterwise year5 vtz,sitc 30 kva ups cnt lab,camc of ups post warranty quarterwise year1 cnt,camc of ups post warranty quarterwise year2 cnt,camc of ups post warranty quarterwise year3 cnt,camc of ups post warranty quarterwise year4 cnt,camc of ups post warranty quarterwise year5 cnt,sitc 30 kva ups vjy lab,camc of ups post warranty quarterwise year1 vjy,camc of ups post warranty quarterwise year2 vjy,camc of ups post warranty quarterwise year3 vjy,camc of ups post warranty quarterwise year4 vjy,camc of ups post warranty quarterwise year5 vjy
Sitc 40 kva ups vtz lab,camc of ups post warranty quarterwise year1 vtz,camc of ups post warranty quarterwise year2 vtz,camc of ups post warranty quarterwise year3 vtz,camc of ups post warranty quarterwise year4 vtz,camc of ups post warranty quarterwise year5 vtz,sitc 30 kva ups cnt lab,camc of ups post warranty quarterwise year1 cnt,camc of ups post warranty quarterwise year2 cnt,camc of ups post warranty quarterwise year3 cnt,camc of ups post warranty quarterwise year4 cnt,camc of ups post warranty quarterwise year5 cnt,sitc 30 kva ups vjy lab,camc of ups post warranty quarterwise year1 vjy,camc of ups post warranty quarterwise year2 vjy,camc of ups post warranty quarterwise year3 vjy,camc of ups post warranty quarterwise year4 vjy,camc of ups post warranty quarterwise year5 vjy
Read moreHex. head screw m 8x30 for earthing device of ctrb drawing no. :- rdso drg.no.cg-15070 alt.(1) [ warranty period: 30 months after the date of delivery ]
Hex. head screw m 8x30 for earthing device of ctrb drawing no. :- rdso drg.no.cg-15070 alt.(1) [ warranty period: 30 months after the date of delivery ]
Read moreSafety wire rope assembly for fiat bogie. drawing no:- lw 05105 alt.(a) specification:-mdst-147 rev.(nil) [ warranty period: 30 months after the date of delivery ]
Safety wire rope assembly for fiat bogie. drawing no:- lw 05105 alt.(a) specification:-mdst-147 rev.(nil) [ warranty period: 30 months after the date of delivery ]
Read moreLead seal circular 17.5 mm for sealing purpose conforming to irs z-14-71 and is:13923-2023 (first revision). [ warranty period: 30 months after the date of delivery ]
Lead seal circular 17.5 mm for sealing purpose conforming to irs z-14-71 and is:13923-2023 (first revision). [ warranty period: 30 months after the date of delivery ]
Read moreIsi marked xlpe insulated ltug 4c x 16 sq. mm cable with 30 months warranty period
Isi marked xlpe insulated ltug 4c x 16 sq. mm cable with 30 months warranty period
Read moreModified washable side body filter as per cee/nr drg no. cee/nr/elect/3118 suitable for rajdhani/shatabdi high capacity power cars. [ warranty period: 30 months after the date of delivery]
Modified washable side body filter as per cee/nr drg no. cee/nr/elect/3118 suitable for rajdhani/shatabdi high capacity power cars. [ warranty period: 30 months after the date of delivery]
Read moreControl genset, product no.-0300-6014, model no.-hmi 211, make-cummins. (warranty : 30 months from the date of delivery)
Control genset, product no.-0300-6014, model no.-hmi 211, make-cummins. (warranty : 30 months from the date of delivery)
Read moreTar plastic bituminous compound for water-proofing and caulking purposes used steel drum packing material. warranty period 30 months from the date of supply.
Tar plastic bituminous compound for water-proofing and caulking purposes used steel drum packing material. warranty period 30 months from the date of supply.
Read moreOverhauling kit for brake cylinder pbacm 254-130 faiveley make for lhb coaches consisting of items tabulated as per attached annexure. [ warranty period: 36 months after the date of delivery ]
Overhauling kit for brake cylinder pbacm 254-130 faiveley make for lhb coaches consisting of items tabulated as per attached annexure. [ warranty period: 36 months after the date of delivery ]
Read moreof your Industry type