Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
111 A1 A2 And B1 B2 Damaged Traverse Pipe Dismantling, Repairing, Fabrication And Erection Of M. S. Plates Support, M. S. Rod, Panels And New Channel Support New Fabrication And Erection For Bunker No. B3 Of Pre Washery At Kedla Washery.
|
| Description |
111 A1 A2 And B1 B2 Damaged Traverse Pipe Dismantling, Repairing, Fabrication And Erection Of M. S. Plates Support, M. S. Rod, Panels And New Channel Support New Fabrication And Erection For Bunker No. B3 Of Pre Washery At Kedla Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_317214_1 |
|
Reference Number |
PO/KW/E-Tender/24-25/30, Dated-10.09.2024 |
| Tender Fee | 0 |
| EMD | 3400 |
| Tender Value | - |
| Place | KEDLA WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328752 |
| Start Date | September 11, 2024 16:30 |
| End Date |
Expired
20/09/2024
Expired 755 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of 04 nos. double roll crusher bearing housing of unit no. 113a1a2 and b1b2 of pre-washery at kedla washery.
Repairing of 04 nos. double roll crusher bearing housing of unit no. 113a1a2 and b1b2 of pre-washery at kedla washery.
Read moreRepairing of 04 nos. er mass, dead weight with shaft of vibrating screen unit no. 111a1a2 of pre-washery at kedla washery.
Repairing of 04 nos. er mass, dead weight with shaft of vibrating screen unit no. 111a1a2 of pre-washery at kedla washery.
Read moreRepairing of 04 nos. er mass, dead weight with shaft of vibrating screen unit no. 111a1a2 of pre-washery at kedla washery
Repairing of 04 nos. er mass, dead weight with shaft of vibrating screen unit no. 111a1a2 of pre-washery at kedla washery
Read moreDismantling, repairing and re-installation of 08 nos. traverse pipes (size-2.4mtr.) of unit no. 206 screen and 14 nos. traverse pipes (size-1.8mtr.) of unit no. 221a1a2 and b1b2 screen of main plant of kedla washery.
Dismantling, repairing and re-installation of 08 nos. traverse pipes (size-2.4mtr.) of unit no. 206 screen and 14 nos. traverse pipes (size-1.8mtr.) of unit no. 221a1a2 and b1b2 screen of main plant of kedla washery.
Read moreRepairing, fabrication/erection of rake loading bunker gate / chute in railway siding at sawang washery.
Repairing, fabrication/erection of rake loading bunker gate / chute in railway siding at sawang washery.
Read moreOld deformed grizzly sector repairing for bunker no. a2 and b2 of pre-washery at kedla washery.
Old deformed grizzly sector repairing for bunker no. a2 and b2 of pre-washery at kedla washery.
Read moreDismantling and reinstallation of different assemblies of belt conveyors unit no. 116a and b and 133a and b for lagging work, and a1 bunker jam cleaning and 111a1a2 cracked body repairing of pre washery at kedla washery
Dismantling and reinstallation of different assemblies of belt conveyors unit no. 116a and b and 133a and b for lagging work, and a1 bunker jam cleaning and 111a1a2 cracked body repairing of pre washery at kedla washery
Read more116b belt changing, 118b belt changing, a1 and b1 jammed bunker cleaning of pre-washery at kedla washery
116b belt changing, 118b belt changing, a1 and b1 jammed bunker cleaning of pre-washery at kedla washery
Read moreFencing of walk-way of 116a,b b/conv. and 133a,b b/conv. and rcb bunker surrounding fencing and 111a1a2 and b1b2 under hopper lining, 133a,b guide channel strengthening and structure column bracing strengthening of pre-washery
Fencing of walk-way of 116a,b b/conv. and 133a,b b/conv. and rcb bunker surrounding fencing and 111a1a2 and b1b2 under hopper lining, 133a,b guide channel strengthening and structure column bracing strengthening of pre-washery
Read more1301-fabrication and erection of mill bunker structures
Fabrication and erection of mill bunker structures (at lhs) including ms decking sheet and side cladding sheet for 1x660 mw panki thermal power project.
Read moreof your Industry type