Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out Thickness Survey Of Process Piping, Storage Tanks And Fire Water Line Network At Wrpl, Viramgam
|
| Description |
Carrying Out Thickness Survey Of Process Piping, Storage Tanks And Fire Water Line Network At Wrpl, Viramgam
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2024_WRVGM_175176_1 |
|
Reference Number |
WRPL/VGM/TS/2023-24/070 |
| Tender Fee | 0 |
| EMD | 26956 |
| Tender Value | - |
| Place | WRPL Viramgam |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=185946 |
| Start Date | March 04, 2024 17:30 |
| End Date |
Expired
25/03/2024
Expired 934 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pwrjt26324 - carrying out urgent civil repair works arising out of flood damage at wrpl viramgam residential colony.
Pwrjt26324 - carrying out urgent civil repair works arising out of flood damage at wrpl viramgam residential colony.
Read moreSelection of bidder for carrying out restoration rectification new activities of network of selected blocks in tanfinet pkg-d project
Selection of bidder for carrying out restoration rectification new activities of network of selected blocks in tanfinet pkg-d project
Read moreEngagement of agency for carrying out topographical survey of industrial estates of aidc as per the requirements of pm gati shakti portal
Engagement of agency for carrying out topographical survey of industrial estates of aidc as per the requirements of pm gati shakti portal
Read moreFixing of rate contract for carrying out preventive maintenance /emergent works of distribution network under jurisdiction of electric division vijaypur ,jpdcl ,jammu
As per sbd
Read moreCarrying out survey investigation and design of proposed tunnel and aqueducts on chankapur right canal and chankapur right bank extended canal under nar par girna river link project
Carrying out survey investigation and design of proposed tunnel and aqueducts on chankapur right canal and chankapur right bank extended canal under nar par girna river link project
Read moreOut sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit 9070c26d19 lining up agency for carrying out tank m and i of intermediate tanks in iocl paradip refinery, as per tender
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit 9070c26d19 lining up agency for carrying out tank m and i of intermediate tanks in iocl paradip refinery, as per tender
Read moreCustom bid for services - outsourcing of mineral support services for carrying out xenotime bearing hmc recovery and field related work like panning pitting reconnaissance and detailed survey and other camp work at camp siri river unit lotapanigarhak..
Custom bid for services - outsourcing of mineral support services for carrying out xenotime bearing hmc recovery and field related work like panning pitting reconnaissance and detailed survey and other camp work at camp siri river unit lotapanigarhak..
Read moreCarrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Read moreRate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje
Rate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje
Read moreof your Industry type