Tender Details
Particulars | Details |
---|---|
Title |
Toll Collection At Toll Point 23 On Kaithal Khanouri Road Near Punjab Border In Kaithal Distt For A Period Of 18 Months
|
Description |
Toll Collection At
Toll Point 23 On
Kaithal Khanouri Road Near Punjab Border In Kaithal
Disttfor A Period Of 18 Months
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_288316_1 |
Reference Number |
PWD EE PD I Kaithal TP 23 2023 |
Tender Fee | 10000 |
EMD | 11.27 Lakh |
Tender Value | 1 |
Place | Kaithal |
Link | https://etenders.hry.nic.in |
Start Date | June 07, 2023 16:30 |
End Date |
26/06/2023 ( Expired 687 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreRequest for proposal for selection of acquirer bank for fastag-anpr based multi lane free flow (mlff) user fee collection at nemili (sriperumbudur) fee plaza of walajapet poomalle (nh-48) toll road project
Request for proposal for selection of acquirer bank for fastag-anpr based multi lane free flow (mlff) user fee collection at nemili (sriperumbudur) fee plaza of walajapet poomalle (nh-48) toll road project
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Read moreWbpwd(r)/se/chc/nib-01/25-26/1 / collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Read moreof your Industry type