Tender Details
Particulars | Details |
---|---|
Title |
Shifting Dismantling Erection Handover Of 11 Kv Nuagaon Feeder Emanating From Pottangi 33/11 Kv Pss For Improvement Of Pwd Road To Deomali Hill Top Under Eso Pottangi
|
Description |
Shifting Dismantling Erection Handover Of 11 Kv Nuagaon Feeder Emanating From Pottangi 33/11 Kv Pss For Improvement Of Pwd Road To Deomali Hill Top Under Eso Pottangi
|
Organisation | EIC-CIVIL | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 65625 |
Tender Value | |
Place | Pottangi, Koraput. |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 22:30 |
End Date |
22/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 3 nos. of 33kv line bays for 33/11kv koutruk substation and erection of 33kv line from iroisemba to national sports university (nsu), koutruk on turnkey basis.
Installation of 3 nos. of 33kv line bays for 33/11kv koutruk substation and erection of 33kv line from iroisemba to national sports university (nsu), koutruk on turnkey basis.
Read moreImprovement of road from nh 08 to darchawi shermontilla road near pajendra para via sidongbanapally high school under valley adc under pabiacherra assembly constituency l 3575 km of kumarghat pwdr and b division under the scheme for special assistanc
Improvement of road from nh 08 to darchawi shermontilla road near pajendra para via sidongbanapally high school under valley adc under pabiacherra assembly constituency l 3575 km of kumarghat pwdr and b division under the scheme for special assistanc
Read moreUpgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Upgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Read moreShifting dismantling erection handover of 11kv nuagaon feeder emanating from pottangi 33/11 kv pss for improvement of pwd road to deomali hill top under eso pottangi
Shifting dismantling erection handover of 11kv nuagaon feeder emanating from pottangi 33/11 kv pss for improvement of pwd road to deomali hill top under eso pottangi
Read moreTransportation of one no. 132/33 kv, 50 mva imp make power transformer from 220/132/33 kv grid substation, govindpur to 132/33 kv gss manoharpur
Transportation of one no. 132/33 kv, 50 mva imp make power transformer from 220/132/33 kv grid substation, govindpur to 132/33 kv gss manoharpur and its erection, testing and commissioning at existing plinth of gss manoharpur as well as dismantling.
Read moreInterconnection work of 33 kv banjari feeder to 33 kv semliya feeder from 33/11 kv substation sagwali to 33/11 kv substation semliya under onm division mahidpur
Interconnection work of 33 kv banjari feeder to 33 kv semliya feeder from 33/11 kv substation sagwali to 33/11 kv substation semliya under onm division mahidpur
Read moreWork for shifting of utility of road birdhwal-pugal-bajju between km 49.200 to km 107.200 for improvement of road from iw to national highway double lane specification
Work for shifting of utility of road birdhwal-pugal-bajju between km 49.200 to km 107.200 for improvement of road from iw to national highway double lane specification
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing and commissioning for evacuation of power at 33kv level from 132 bye 33 kv grid station soti, changa to 33 bye11kv receiving station thathri in district doda
Design, engineering, manufacture, survey, supply, transportation, erection, testing and commissioning for evacuation of power at 33kv level from 132 bye 33 kv grid station soti, changa to 33 bye11kv receiving station thathri in district doda
Read moreShifting/re-routing and raising the height of 11 kv feeder lines fed from 33 kv sector-4, 33 kv sector-6 and 33 kv hsiidc sub station crossing over the 2nd carriage way of outer byepass road adjoining sector-4-ii and 5 (phase-i and ii), ue, karnal. (
Shifting/re-routing and raising the height of 11 kv feeder lines fed from 33 kv sector-4, 33 kv sector-6 and 33 kv hsiidc sub station crossing over the 2nd carriage way of outer byepass road adjoining sector-4-ii and 5 (phase-i and ii), ue, karnal. (
Read moreShifting of 11kv line from oerc to tamarind eve apartment junction for improvement and widening of road from institute of mathematics ekamrakanan via infocity from ch. 5.700km to 7.640km.
Shifting of 11kv line from oerc to tamarind eve apartment junction for improvement and widening of road from institute of mathematics ekamrakanan via infocity from ch. 5.700km to 7.640km.
Read moreof your Industry type