Tender Details

Particulars Details
Title
Periodical Repair Of Road Starts From Vip Road To Secretariat Gate, New Capital Complex, During The Year 2023 24 Sh Bc, Tack Coat, Road Side Blinker, Traffic Signs And Other Allied Works. (Length Is 0.800 Km).
Description
Periodical Repair Of Road Starts From Vip Road To Secretariat Gate, New Capital Complex, During The Year 2023 24 Sh Bc, Tack Coat, Road Side Blinker, Traffic Signs And Other Allied Works. (Length Is 0.800 Km).
Organisation Government of Tripura
Tender Id 2023_CEPWD_42850_1
Reference
Number
69_SE_II_PWD_RandB_2023_24
Tender Fee 4000
EMD 2.35 Lakh
Tender Value
Place O/O the EE, Agt. Divn.III, PWD(RandB)
Link https://tripuratenders.gov.in
Start Date October 10, 2023 00:10
End Date

19/10/2023 ( Expired 550 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)

Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)&amp#x0d &amp#x0d

Read more
Periodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)

Periodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)

Read more
Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)

Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)

Read more
Fdr to the pwd road from babul chowmuhani_ic nagar road to noadi (l_1 point 10 km) under amtali pwd (rnb) sub division during the year 2024_25_sh_patch repairing, patch metalling, carpeting, premix seal coat and other allied works

Fdr to the pwd road from babul chowmuhani_ic nagar road to noadi (l_1 point 10 km) under amtali pwd (rnb) sub division during the year 2024_25_sh_patch repairing, patch metalling, carpeting, premix seal coat and other allied works

Read more
Fdr maintenance of road from champak nagar to jampuijala (total road length 13.65km) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh patch carpeting, tack coat, seal coat..etc.(group- iii) (at ch. 10.00 to 12.50 km)

Fdr maintenance of road from champak nagar to jampuijala (total road length 13.65km) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh patch carpeting, tack coat, seal coat..etc.(group- iii) (at ch. 10.00 to 12.50 km)

Read more
Fdr maintenance of road from aa road to kalibari (total road length 14.00 km) under khumulwng sub division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat, seal coat, and other allied work etc. (gr-vi)

Fdr maintenance of road from aa road to kalibari (total road length 14.00 km) under khumulwng sub division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat, seal coat, and other allied work etc. (gr-vi)

Read more
Fdr maintenance of road from aa road to kalibari (total road length 14.00 km) (near balaram thakur foot bridge approach) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat..(gr-v)

Fdr maintenance of road from aa road to kalibari (total road length 14.00 km) (near balaram thakur foot bridge approach) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat..(gr-v)

Read more
Shifting of water supply pipelines laid in the northern side road of mata tripura sundari temple complex along with other allied works, udaipur, gomati tripura during the year 2024-25.

Shifting of water supply pipelines laid in the northern side road of mata tripura sundari temple complex along with other allied works, udaipur, gomati tripura during the year 2024-25.

Read more
Periodical renewal of road from rambazar to dukhiakobra para (l 2.20 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h. widening by gsb, wbm-ii, wbm-iii, carpeting , sand seal coat and road side..

Periodical renewal of road from rambazar to dukhiakobra para (l 2.20 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h. widening by gsb, wbm-ii, wbm-iii, carpeting , sand seal coat and road side..

Read more
Periodical renewal of road from kunjabihari to rambazar(l 2.00 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h widening by gsb, wbm ii, wbm-iii, re carpeting , sand seal coat and road side..

Periodical renewal of road from kunjabihari to rambazar(l 2.00 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h widening by gsb, wbm ii, wbm-iii, re carpeting , sand seal coat and road side..

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise