Tender Details
Particulars | Details |
---|---|
Title |
Periodical Repair Of Road Starts From Vip Road To Secretariat Gate, New Capital Complex, During The Year 2023 24 Sh Bc, Tack Coat, Road Side Blinker, Traffic Signs And Other Allied Works. (Length Is 0.800 Km).
|
Description |
Periodical Repair Of Road Starts From Vip Road To Secretariat Gate, New Capital Complex, During The Year 2023 24 Sh Bc, Tack Coat, Road Side Blinker, Traffic Signs And Other Allied Works. (Length Is 0.800 Km).
|
Organisation | Government of Tripura |
Tender Id | 2023_CEPWD_42850_1 |
Reference Number |
69_SE_II_PWD_RandB_2023_24 |
Tender Fee | 4000 |
EMD | 2.35 Lakh |
Tender Value | |
Place | O/O the EE, Agt. Divn.III, PWD(RandB) |
Link | https://tripuratenders.gov.in |
Start Date | October 10, 2023 00:10 |
End Date |
19/10/2023 ( Expired 550 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)
Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)&#x0d &#x0d
Read morePeriodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)
Periodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)
Read moreMtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)
Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)
Read moreFdr to the pwd road from babul chowmuhani_ic nagar road to noadi (l_1 point 10 km) under amtali pwd (rnb) sub division during the year 2024_25_sh_patch repairing, patch metalling, carpeting, premix seal coat and other allied works
Fdr to the pwd road from babul chowmuhani_ic nagar road to noadi (l_1 point 10 km) under amtali pwd (rnb) sub division during the year 2024_25_sh_patch repairing, patch metalling, carpeting, premix seal coat and other allied works
Read moreFdr maintenance of road from champak nagar to jampuijala (total road length 13.65km) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh patch carpeting, tack coat, seal coat..etc.(group- iii) (at ch. 10.00 to 12.50 km)
Fdr maintenance of road from champak nagar to jampuijala (total road length 13.65km) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh patch carpeting, tack coat, seal coat..etc.(group- iii) (at ch. 10.00 to 12.50 km)
Read moreFdr maintenance of road from aa road to kalibari (total road length 14.00 km) under khumulwng sub division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat, seal coat, and other allied work etc. (gr-vi)
Fdr maintenance of road from aa road to kalibari (total road length 14.00 km) under khumulwng sub division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat, seal coat, and other allied work etc. (gr-vi)
Read moreFdr maintenance of road from aa road to kalibari (total road length 14.00 km) (near balaram thakur foot bridge approach) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat..(gr-v)
Fdr maintenance of road from aa road to kalibari (total road length 14.00 km) (near balaram thakur foot bridge approach) under khumulwng sub-division pwd(r and b) during the year 2024-25 sh protection work, patch carpeting, tack coat..(gr-v)
Read moreShifting of water supply pipelines laid in the northern side road of mata tripura sundari temple complex along with other allied works, udaipur, gomati tripura during the year 2024-25.
Shifting of water supply pipelines laid in the northern side road of mata tripura sundari temple complex along with other allied works, udaipur, gomati tripura during the year 2024-25.
Read morePeriodical renewal of road from rambazar to dukhiakobra para (l 2.20 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h. widening by gsb, wbm-ii, wbm-iii, carpeting , sand seal coat and road side..
Periodical renewal of road from rambazar to dukhiakobra para (l 2.20 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h. widening by gsb, wbm-ii, wbm-iii, carpeting , sand seal coat and road side..
Read morePeriodical renewal of road from kunjabihari to rambazar(l 2.00 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h widening by gsb, wbm ii, wbm-iii, re carpeting , sand seal coat and road side..
Periodical renewal of road from kunjabihari to rambazar(l 2.00 km) under old agartala r.d block under pwd(r and b) khayerpur subdivision during the year 2024-25 s.h widening by gsb, wbm ii, wbm-iii, re carpeting , sand seal coat and road side..
Read moreof your Industry type