Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rubber Lagging 20 Mm Thick At Site Of Different Belt Conveyors Of Mic And 3 N4 Incline, Jhanjra Project Colliery.
|
| Description |
Rubber Lagging 20 Mm Thick At Site Of Different Belt Conveyors Of Mic And 3 N4 Incline, Jhanjra Project Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_329163_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/140 dated 12.02.2025 |
| Tender Fee | 0 |
| EMD | 13700 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341181 |
| Start Date | February 18, 2025 16:30 |
| End Date |
Expired
28/02/2025
Expired 597 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Read more08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
Read moreIchp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Read moreRectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Rectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Read moreInstallation of belt conveyors for k13 panel of lhcm in rv seam of khottadih colliery, pandaveswar area
Installation of belt conveyors for k13 panel of lhcm in rv seam of khottadih colliery, pandaveswar area
Read moreRepairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Repairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Read moreProposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery
Proposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery
Read moreRepairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Repairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Read moreCustom bid for services - cleaning maintenance operation and extension of 8 nos of belt conveyors installed at incline and working seams at saoner mine no 1 saoner sub area of nagpur area
Custom bid for services - cleaning maintenance operation and extension of 8 nos of belt conveyors installed at incline and working seams at saoner mine no 1 saoner sub area of nagpur area
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreof your Industry type