Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constr Of Four Grazier Huts At Balchida Fwd And Shakti Base
|
| Description |
Constr Of Four Grazier Huts At Balchida Fwd And Shakti Base
|
| Organisation | IHQ of MoD (Army)-(OSCC) |
| Tender Id | 2026_ARMY_784926_1 |
|
Reference Number |
A/SAD/2MD/117MB/01/26-27 |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://eprocure.gov.in/cppp/tendersfullview/MTQwNzMzNjA=A13h1OGQ2NzAxYTMwZTJhNTIxMGNiNmEwM2EzNmNhYWZhODk=A13h1OGQ2NzAxYTMwZTJhNTIxMGNiNmEwM2EzNmNhYWZhODk=A13h1MTc4NzM3MTIyNw==A13h1QS9TQUQvMk1ELzExN01CLzAxLzI2LTI3A13h1MjAyNl9BUk1ZXzc4NDkyNl8y |
| Start Date | August 22, 2026 14:30 |
| End Date |
Expired
14/09/2026
Expired 32 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ceramic lined mpo with base plate for bowl mill (xrp-803) (one quantity consists of four mpo with ba,inner cone with both side complete ceramic lining for bowl mill (xrp-803)
Ceramic lined mpo with base plate for bowl mill (xrp-803) (one quantity consists of four mpo with ba,inner cone with both side complete ceramic lining for bowl mill (xrp-803)
Read moreCustom bid for services - vijayawada division hiring of four wheeler nonac base model road vehicles of hatch back for the official use of adenbrnbza and adenbrsbza under srdenbrlinesbza jurisdiction for a period of 30 months
Custom bid for services - vijayawada division hiring of four wheeler nonac base model road vehicles of hatch back for the official use of adenbrnbza and adenbrsbza under srdenbrlinesbza jurisdiction for a period of 30 months
Read moreSpl rep to bldg no p-28 and repair/replacement ppgl sheet and hard standing at trade owned kerb side pump and provn of constr of 01 x washroom outside bldg no.p-100 office complex at army avn base under ge nasik road camp
As per tender documents
Read moreLathe working of fly wheel housing cover 2 5 kva gen set,turbocharger oh of 30 kva genr set,lathe working of four cylinder head and new valve and valve seal fitted 30 kva genr set,repair of mob station regd no 103thcb040,repair of motorola base station vhf regd no 103thcb865
Lathe working of fly wheel housing cover 2 5 kva gen set,turbocharger oh of 30 kva genr set,lathe working of four cylinder head and new valve and valve seal fitted 30 kva genr set,repair of mob station regd no 103thcb040,repair of motorola base station vhf regd no 103thcb865
Read more1000 watt two zone pa power amplifier btz 10000,tza 4000 dpm 400 watt with built in digital player two zone pa mixer amplifier,60 watt 100v pa horn speakers suh 40xt,wsx 684t pa wall speakers 8 watt,goose neck mic gm 601 lm with base,speaker wire 4 conductor cl2 cl3 r in wall four pair,battery 12 volt 100ahc,mobile to ampliire audio cable,microphone cable mike to amplifire lead,mains battery charger 12v to 48volt dc
1000 watt two zone pa power amplifier btz 10000,tza 4000 dpm 400 watt with built in digital player two zone pa mixer amplifier,60 watt 100v pa horn speakers suh 40xt,wsx 684t pa wall speakers 8 watt,goose neck mic gm 601 lm with base,speaker wire 4 conductor cl2 cl3 r in wall four pair,battery 12 volt 100ahc,mobile to ampliire audio cable,microphone cable mike to amplifire lead,mains battery charger 12v to 48volt dc
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type