Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Footpath From Siddhi Sparsh Chs To Sai Siddhi Apt In Sector 23 Juinagar In Nerul Ward
|
Description |
Improvement To Footpath From Siddhi Sparsh Chs To Sai Siddhi Apt In Sector 23 Juinagar In Nerul Ward
|
Organisation | Navi Mumbai Municipal Corporation | State Govt. and UT |
Tender Id | 2025_NMMC_1152899_1 |
Reference Number |
NMMC/ EE(NERUL) / 50 / 2024-2025 |
Tender Fee | 1090 |
EMD | 8000 |
Tender Value | |
Place | Excutive Engineer (Nerul) |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2005708 |
Start Date | February 21, 2025 15:30 |
End Date |
27/02/2025 ( Expired 79 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreWard no. 23 kahrai construction of drain and cement concrete road from manoj chakki wala (arela building material) to chandra niwas dhaniram on nagla kali road.
Ward no. 23 kahrai construction of drain and cement concrete road from manoj chakki wala (arela building material) to chandra niwas dhaniram on nagla kali road.
Read moreWard no. 23 kahrai construction of drain and cement concrete road from gopal vatika to nagla tara chandra on nagla kali road.
Ward no. 23 kahrai construction of drain and cement concrete road from gopal vatika to nagla tara chandra on nagla kali road.
Read moreName of work construction of drain and cement concrete road from lokendra house to sachin house on maruti city road in ward no. 23 kahrai.
Name of work construction of drain and cement concrete road from lokendra house to sachin house on maruti city road in ward no. 23 kahrai.
Read moreConstruction work of drain and cc road from vijay verma house to mata mandir in ward-55 pilakhar nagla bihari
Construction work of drain and cc road from vijay verma house to mata mandir in ward-55 pilakhar nagla bihari
Read moreIn ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
In ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
Read moreof your Industry type