Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Different Types Of Job To Be Done At Silo 2 System During Upcoming Overhauling At Ahp M/M Area Of U#5, Btps.
|
| Description |
Different Types Of Job To Be Done At Silo 2 System During Upcoming Overhauling At Ahp M/M Area Of U#5, Btps.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_938309_1 |
|
Reference Number |
WBPDCL/BTPS/NIT/E2721/25-26 |
| Tender Fee | 0 |
| EMD | 13261 |
| Tender Value | - |
| Place | BTPS,HOOGHLY |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2214887 |
| Start Date | November 06, 2025 17:30 |
| End Date |
Expired
24/11/2025
Expired 324 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Biennial rate contract for different cable laying related job under candi dept btps
Biennial rate contract for different cable laying related job under candi dept btps
Read moreRepair and maintenance of masonry and other misc. works in different types of quarters under btps
Repair and maintenance of masonry and other misc. works in different types of quarters under btps colony at dvc, btps, bokaro
Read moreFixing, fitting, strengthening and repairing job of different structure at ahp area of unit 1 to 5, bktps
Fixing, fitting, strengthening and repairing job of different structure at ahp area of unit 1 to 5, bktps
Read moreHead loss apparatus for minor losses hydraulics lab,centrifugal pump hydraulics lab,friction losses through pipes hydraulics lab,glass u tube manometer manufacturer hydraulics lab,combined shear force and bending moment apparatus,behaviour of column and strut experimental apparatus,principle stress and strain measuring instrument,digital turbidity meter phe lab,digital ph meter phe lab,bod incubator phe lab,digital tds meter phe lab,distillation assembly phe lab,split cylinder test apparatus for tensile strength of concrete,le chatlier apparatus construction material lab,stainless steel hot air oven,working models of gear trains all types,working models of all the in of double slider crank chain mechanism,gear box working model,working model of different brakes,working model of different clutches,vernier calipers digital,thread measuring instrument,jrm whirling hygrometers psychrometers,digital thermo anemometer for air velocity and temperature,drill machine vice,drill chuck with key half inch capacity
Head loss apparatus for minor losses hydraulics lab,centrifugal pump hydraulics lab,friction losses through pipes hydraulics lab,glass u tube manometer manufacturer hydraulics lab,combined shear force and bending moment apparatus,behaviour of column and strut experimental apparatus,principle stress and strain measuring instrument,digital turbidity meter phe lab,digital ph meter phe lab,bod incubator phe lab,digital tds meter phe lab,distillation assembly phe lab,split cylinder test apparatus for tensile strength of concrete,le chatlier apparatus construction material lab,stainless steel hot air oven,working models of gear trains all types,working models of all the in of double slider crank chain mechanism,gear box working model,working model of different brakes,working model of different clutches,vernier calipers digital,thread measuring instrument,jrm whirling hygrometers psychrometers,digital thermo anemometer for air velocity and temperature,drill machine vice,drill chuck with key half inch capacity
Read moreProviding, fabrication and construction of copper plate earthing as per drawing details of electrodes and earth pit at akashvani leh, ladakh,providing and interconnecting earth electrodes with providing, fabrication and fixing of 25mm x 3mm copper strip at akashvani leh, ladakh,providing of 25x3mm copper strip for extension of earthing system up to the transmitter hall, ups and lt panel in premises at akashvani leh, ladakh,laying of 25 mm x 3 mm copper strip from earthing system to bus bars and jointing the all joints and connections of ends of copper strips by copper riveting and brazing at akashvani leh, ladakh,providing of 375x38x6mm copper bus bar with insulators and steel nut bolts and fixing of 375x38x6mm copper bus bar is to be done to terminate the different earthing system at akashvani leh, ladakh,providing and fixing of nomenclature sign marker for earth pits at akashvani leh, ladakh
Providing, fabrication and construction of copper plate earthing as per drawing details of electrodes and earth pit at akashvani leh, ladakh,providing and interconnecting earth electrodes with providing, fabrication and fixing of 25mm x 3mm copper strip at akashvani leh, ladakh,providing of 25x3mm copper strip for extension of earthing system up to the transmitter hall, ups and lt panel in premises at akashvani leh, ladakh,laying of 25 mm x 3 mm copper strip from earthing system to bus bars and jointing the all joints and connections of ends of copper strips by copper riveting and brazing at akashvani leh, ladakh,providing of 375x38x6mm copper bus bar with insulators and steel nut bolts and fixing of 375x38x6mm copper bus bar is to be done to terminate the different earthing system at akashvani leh, ladakh,providing and fixing of nomenclature sign marker for earth pits at akashvani leh, ladakh
Read moreDifferent types of job to be done at silo-2 system during upcoming overhauling at ahp-m/m area of u#5, btps.
Different types of job to be done at silo-2 system during upcoming overhauling at ahp-m/m area of u#5, btps.&#x0d
Read moreDifferent types of jobs to be done during upcoming overhauling at ahp mm area of u2 60 mw btps
Different types of jobs to be done during upcoming overhauling at ahp mm area of u2 60 mw btps
Read moreProcurement of different types of steel materials for upcoming overhauling of u 5,ahp,btps.
Procurement of different types of steel materials for upcoming overhauling of u 5,ahp,btps.
Read moreDifferent area fabrication work to be done during upcoming unit 5 overhauling at ahp area
Different area fabrication work to be done during upcoming unit 5 overhauling at ahp area
Read moreProcurement of refractory cement for upcoming overhauling u 5,ahp,btps.
Procurement of refractory cement for upcoming overhauling u 5,ahp,btps.
Read moreof your Industry type