Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Laying Wbm And Asphalting Road From Kumbharpada Naka To Khandarpada Road At Shirgaon In W.No1 In Vvcmc Area
|
| Description |
Providing And Laying Wbm And Asphalting &Amp#X0d
Road From Kumbharpada Naka To Khandarpada Road At &Amp#X0d
Shirgaon In W.No1 In Vvcmc Area
|
| Organisation | Vasai Virar City Municipal Corporation | State Govt. and UT |
| Tender Id | 2026_VVCMC_1297198_1 |
|
Reference Number |
VVCMC/PWD/CE/T N NO.3/26 |
| Tender Fee | 2860 |
| EMD | 2.31 Lakh |
| Tender Value | |
| Place | VVCMC |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2228368 |
| Start Date | April 22, 2026 21:30 |
| End Date |
Expired
29/04/2026
Expired 79 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and laying of wbm road at lhs- 11a & 11b tail end and boiler maintenance i&r shed area
Providing and laying of wbm road at lhs- 11a & 11b tail end and boiler maintenance i&r shed area
Read moreProviding additional toilet in 73 no b type quarters in block -i, p, r, y and t at nangal township (2nd phase).
Providing additional toilet in 73 no b type quarters in block -i, p, r, y and t at nangal township (2nd phase).
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreNit no 01 work no 01
Door to door collection of waste in all wards 1 to 25 for three years iot based door to door coolection of waste from all residential establishment and commerical establishemnt in both day and night shift of municipal board asind bhilwara rajastahn
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreDevelopment, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreSpl repair to bldg no. p-208 and p-209 (or living) of certain unit and bldg no. p-153 and p-154 (o8 dus) jcos md accn of certain unit and or md accn bldg no. p-150 at army area banar under ge banar
Spl repair to bldg no. p-208 and p-209 (or living) of certain unit and bldg no. p-153 and p-154 (o8 dus) jcos md accn of certain unit and or md accn bldg no. p-150 at army area banar under ge banar
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type