Tender Details

Particulars Details
Title
Construction Of Minor Bridge With Concrete Approaches N.H.4 To Shsh Kalamba Salonkenagar Balinge Shignapur Chikali S.H.194 Km 1/750 Tal Karveer Dist. Kolhapur
Description
Construction Of Minor Bridge With Concrete&Amp#X0d Approaches N.H.4 To Shsh Kalamba Salonkenagar Balinge Shignapur&Amp#X0d Chikali S.H.194 Km 1/750 Tal Karveer Dist. Kolhapur
Organisation Public Works Region-Pune | State Govt. and UT
Tender Id 2024_PWDRP_1093828_1
Reference
Number
53 for 2024-25 (B1) (OPEN)
Tender Fee 2860
EMD 1.5 Lakh
Tender Value
Place Works
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1909462
Start Date October 01, 2024 16:40
End Date

08/10/2024 ( Expired 198 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.

Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.

Read more
Construction of new 4 lane with paved shoulder access controlled coastal highway from puri to kakatpur (km. 47.340 to km. 89.400) on hybrid annuity mode in the state of odisha (package ii)

Construction of new 4 lane with paved shoulder access controlled coastal highway from puri to kakatpur (km. 47.340 to km. 89.400) on hybrid annuity mode in the state of odisha (package ii)

Read more
Construction of new 4 lane with paved shoulder access controlled coastal highway from kakatpur to erasama (km.89.400 to km. 137.00) on hybrid annuity mode in the state of odisha (package iii)

Construction of new 4 lane with paved shoulder access controlled coastal highway from kakatpur to erasama (km.89.400 to km. 137.00) on hybrid annuity mode in the state of odisha (package iii)

Read more
Construction of new 4 lane with paved shoulder access controlled coastal highway from erasama to paradeep (km. 137.00 to km. 163.200) on hybrid annuity mode in the state of odisha (package iv)

Construction of new 4 lane with paved shoulder access controlled coastal highway from erasama to paradeep (km. 137.00 to km. 163.200) on hybrid annuity mode in the state of odisha (package iv)

Read more
Construction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)

Construction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)

Read more
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.

Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.

Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe

Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise