Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engaging Of Dbc Workers For Dengue Activities Through Out Sourcing 4 Months In Ponneri Municipality
|
| Description |
Engaging Of Dbc Workers For Dengue Activities Through Out Sourcing 4 Months In Ponneri Municipality
|
| Organisation | MAWS | State Govt. and UT |
| Tender Id | 2025_MAWS_593050_1 |
|
Reference Number |
06/2021/H1 |
| Tender Fee | 0 |
| EMD | 19000 |
| Tender Value | |
| Place | MUNICIPAL OFFICE PONNERI |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=745442 |
| Start Date | November 14, 2025 19:30 |
| End Date |
Expired
19/11/2025
Expired 227 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pumping out of storm water from various areas of dock interior zone for a period of 12 months (2026-27), hdc haldia
Pumping out of storm water from various areas of dock interior zone for a 
 period of 12 months (2026-27), hdc haldia
Read moreConstruction of ht covered conductor and ht abc for in connecting feeder through nh
Construction of ht covered conductor and ht abc for in connecting feeder through nh
Read moreManufacturing of fly ash bricks in pre-casting yard,block-4 of nts for 2026-27
Manufacturing of fly ash bricks in pre-casting yard,block-4 of nts for 2026-27
Read moreEngagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreConsultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreProvn of 02 x toilet blocks consisting 8 toilets for girls and boys each at children school (sr wing) kanpur cantt and provision of 01 x toilet adjacent to bldg no p-4 in cqa (gs) kanpur at cqa (gs) under ge (i) kanpur
Provn of 02 x toilet blocks consisting 8 toilets for girls
 and boys each at children school (sr wing) kanpur cantt
 and provision of 01 x toilet adjacent to bldg no p-4 in cqa
 (gs) kanpur at cqa (gs) under ge (i) kanpur
Read moreof your Industry type