Tender Details
Particulars | Details |
---|---|
Title |
Cell Pack,Stromatolyser,Cell Clean,Cell Pack H 560 20 Ltr Pack,Lyser 1 H 560,Lyser 2 H 560,Cell C
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 19, 2025 17:26 |
End Date |
09/06/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreSquare pipe 1 point 5,1 1 by 2 inch x11 by 2 inch sq pipe 20 inch,wire mesh,bearing 4 inch,tee elbo
Read more
Special repairs to a-1 (cook house), b-1 and b-2 (toilets), c-1 and c-2 (bathrooms) of building no p-04 of 15 assam under ge (w) colaba, mumbai
Special repairs to a-1 (cook house), b-1 and b-2 (toilets), c-1 and c-2 (bathrooms) of building no p-04 of 15 assam under ge (w) colaba, mumbai
Read moreOil filter element,hydraulic pipe,fuel filter element,fuel filter set 1 by 2 ltr,connector pipe,jub
Read more
Annual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.
Annual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.
Read moreInton cal 3point0 ml,cell clean,sulfolyser 5l,cell pack dfl 1 into 1 ltr,inton check l1 l2 l3 3poin
Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of 1 x 20 mtr 2 lane truss girder bridge over nallah vinjey at wagahama near jamia masjid alidades.
Construction of 1 x 20 mtr 2 lane truss girder bridge over nallah vinjey at wagahama near jamia masjid alidades.
Read moreof your Industry type