Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Works For Replacement Of Conveyor Structures Of Silo Gantry At Chp, Rgocm I, Rg Iii Area.
|
| Description |
Balance Works For Replacement Of Conveyor Structures Of Silo Gantry At Chp Rgocm I Rg Iii Area
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 615646 |
|
Reference Number |
RG-III/CVL/ET-31/25-26 |
| Tender Fee | 272 |
| EMD | 15300 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | July 24, 2025 21:30 |
| End Date |
Expired
28/07/2025
Expired 446 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of fr grade conveyor belts for chp-iii, ptps, panipat
Supply of fr grade conveyor belts for chp-iii, ptps, panipat
Read morePeriodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Read morePeriodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Read moreReplacement of damaged doors and windows to na, nb, nc, sc2, c2, t2 quarters and public buildings at centenary colony, rg-iii area.
Replacement of damaged doors and windows to na, nb, nc, sc2, c2, t2 quarters and public buildings at centenary colony, rg-iii area.
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports strengthening of weld joints and painting the steel structures of unit iii boiler roof
Ttps mech ii bm unit iii replacement of wornout corroded structural supports strengthening of weld joints and painting the steel structures of unit iii boiler roof
Read moreTtps operation circle o e ii rectification and replacement of failed tapping pipe lines from fire hydrant line of mvws sprinkler system at unit i, ii and iii bunker and conveyor-26a and b, trash screen and conveyor 25a and b, tunnel conveyor 36a and
Ttps operation circle o e ii rectification and replacement of failed tapping pipe lines from fire hydrant line of mvws sprinkler system at unit i, ii and iii bunker and conveyor-26a and b, trash screen and conveyor 25a and b, tunnel conveyor 36a and
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreReplacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Read moreCivil repairs for surface substation and erection and fabrication, sheeting works to tyre section and repair works to existing tool room at dumper section, replacement of sintex tanks near canteen and dumper section toilets, ocp-ii, rg-iii area.
Civil repairs for surface substation and erection and fabrication, sheeting works to tyre section and repair works to existing tool room at dumper section, replacement of sintex tanks near canteen and dumper section toilets, ocp-ii, rg-iii area.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type