Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 03 (Three) Nos. Isolation Stopping In Kenda Bottom Seam Of Kunustoria Colliery Under Kunustoria Area
|
| Description |
Construction Of 03 (Three) Nos. Isolation Stopping In Kenda Bottom Seam Of Kunustoria Colliery Under Kunustoria Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_295304_1 |
|
Reference Number |
ECL/KNT/CMC/NIT/23-24/280, Dt. 04.12.2023 |
| Tender Fee | |
| EMD | 11500 |
| Tender Value | |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | December 07, 2023 16:30 |
| End Date |
Expired
18/12/2023
Expired 948 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of 04 (four) nos. sectionalization stopping in kenda bottom seam of kunustoria colliery under kunustoria area
Construction of 04 (four) nos. sectionalization stopping in kenda bottom seam of kunustoria colliery under kunustoria area
Read moreRepairing of seven (07) nos. sectionalization stopping in kenda bottom seam of kunustoria colliery under kunustoria area
Repairing of seven (07) nos. sectionalization stopping in kenda bottom seam of kunustoria colliery under kunustoria area
Read moreConstruction of 05 (five) nos. isolation stopping for proposed panel ke-34(btm) in kenda bottom section of kenda composite seam of kunustoria colliery under kunustoria area
Construction of 05 (five) nos. isolation stopping for proposed panel ke-34(btm) in kenda bottom section of kenda composite seam of kunustoria colliery under kunustoria area
Read moreConstruction of 03 (three) nos. preparatory sectionalization stopping in between 57-58d from 4rl to 2rl in kenda bottom seam of kunustoria colliery under kunustoria area
Construction of 03 (three) nos. preparatory sectionalization stopping in between 57-58d from 4rl to 2rl in kenda bottom seam of kunustoria colliery under kunustoria area
Read moreConstruction of 16 (sixteen) nos. isolation stopping for proposed panel kt-48 (top) in kenda top seam at kunustoria colliery under kunustoria area
Construction of 16 (sixteen) nos. isolation stopping for proposed panel kt-48 (top) in kenda top seam at kunustoria colliery under kunustoria area
Read moreConstruction of pumping station in kenda bottom seam at kunustoria colliery under kunustoria area
Construction of pumping station in kenda bottom seam at kunustoria colliery under kunustoria area
Read moreof your Industry type