Tender Details

About Tender

🚂 Procurement Opportunity: Measuring Monitoring Relay (Ht Mmr) For Lhb Eog Coaches 🔧🚂 The Ministry Of Railways, Central Government, Invites Bids For The Supply Of Measuring Monitoring Relay (Ht Mmr) As Per Rdso Specification No. Rdso/Pe/Spec/Ac/0184 2015 (Rev. 1), Suitable For Switchboard Cabinets Of Lhb Type Eog Coaches. 📅 Bid Submission Deadline: April 22, 2024, 11:00 Am Earnest Money Deposit (Emd): Inr 390170 Interested Bidders Should Refer To The Tender Document For Complete Details And Specifications. Bids Must Adhere To The Rdso Specifications And Be Submitted Before The Stipulated Deadline. Keywords: Measuring Monitoring Relay, Ht Mmr, Lhb Eog Coaches, Ministry Of Railways, Rdso Specification, Tender, Procurement, Government Contract
Particulars Details
Title
Pvc Insulated With Frls Flexible Multistrand
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106290658
Reference
Number
02241299
Tender Fee 0
EMD 0
Tender Value
Place Kolkata
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/102024/106477523/viewNitPdf_4719661.pdf

Start Date September 19, 2024 00:17
End Date
Expired 09/10/2024

Expired 652 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Pvc insulated with frls flexible multistrand

For complete deion and other details, please refer to tender

Read more
Pvc insulated with frls flexible multistrand

For complete deion and other details, please refer to tender

Read more
Multistrand pvc insulated flexible copper cable

For complete deion and other details, please refer to tender

Read more
Multistrand pvc insulated flexible copper cable

For complete deion and other details, please refer to tender

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise