Particulars Details
Title
Barc/Tsd/33/2023 24
Description
Up Gradation Of Lighting In Common Areas With Solid State Lights And Associated Works In Barc, Trombay, Mumbai 85.
Organisation Central Public Procurement Portal 1
Tender Id 2023_BARC_767769_1
Reference
Number
BARC/TSD/33/2023-24
Tender Fee 0
EMD 5 Lakh
Tender Value
Place TSD, BARC, TROMBAY, MUMBAI
Link https://eprocure.gov.in
Start Date August 23, 2023 14:30
End Date

22/09/2023 ( Expired 605 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Read more
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode

Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode

Read more
Refurbishment of false ceiling and other miscellaneous civil works at mod labs and other buildings, north site, barc, trombay, mumbai

Refurbishment of false ceiling and other miscellaneous civil works at mod labs and other buildings, north site, barc, trombay, mumbai

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol

Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.