Tender Details
Particulars | Details |
---|---|
Title |
Repair And Restoration Of Damaged Saroya Distribution System Of Outlet Off Taking At Rd 2700 M Of Saroya Distributory Offtaking At Rd 112.526 Km Right Side Of Kandi Canal Stage 2
|
Description |
Repair And Restoration Of Damaged Saroya Distribution System Of Outlet Off Taking At Rd 2700 M Of Saroya Distributory Offt Aking At Rd 112.526 Km Right Side Of Kandi Canal Stage 2
|
Organisation | Government of Punjab |
Tender Id | 2023_WR_113648_3 |
Reference Number |
66 |
Tender Fee | 2000 |
EMD | 56159 |
Tender Value | |
Place | Xen,Kandi Canal Stage2 Division,hoshiarpur |
Link | https://eproc.punjab.gov.in |
Start Date | January 03, 2024 19:30 |
End Date |
18/01/2024 ( Expired 479 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under pro psk in mizoram
Read moreMaintenance works including petty works to be d at site as per the necessity demands emergent nature for up keeping of new partap canal from rd 19200-33650m and its distribution system
Maintenance works including petty works to be d at site as per the necessity demands emergent nature for up keeping of new partap canal from rd 19200-33650m and its distribution system
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreReconstruction of broken boundary wall repair of apf floor and replacement of damaged ac sheets of apf no.2 r/m of 08nos type 1st staff quarters internal roads by hot mix plant interlocking tiles drain repairing etc at nmy bisalpur
Reconstruction of broken boundary wall repair of apf floor and replacement of damaged ac sheets of apf no.2 r/m of 08nos type 1st staff quarters internal roads by hot mix plant interlocking tiles drain repairing etc at nmy bisalpur
Read moreWadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dm no 07 on right bank canal at ch 13045 m
Wadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dm no 07 on right bank canal at ch 13045 m
Read more2) permanent restoration to the l/s slope linning of d/s of chitrotpala syphone including desilting and bed clearance of mahanadi left canal from rd 0.00 km. to 6.00 km. for the year 2025-26. (mbd05/2025-26)
Permanent restoration to the l/s slope linning of d/s of chitrotpala syphone including desilting and bed clearance of mahanadi left canal from rd 0.00 km. to 6.00 km. for the year 2025-26. (mbd05/2025-26)
Read moreEmergent repair of rcc pipe 1 m internal dia np3 laid for drainage of the surrounding flooded water during heavy rain at rd 62250 right side ubdc hydel channel near village kataruchak
Emergent repair of rcc pipe 1 m internal dia np3 laid for drainage of the surrounding flooded water during heavy rain at rd 62250 right side ubdc hydel channel near village kataruchak
Read moreRepair / repalcement of exteral water distribution system at officers md accn and replacement/improvement of external water distribution system at mes colony, 122 ta bn, 133 we and 2 fod area at bb cantt, srinagar
Repair / repalcement of exteral water distribution system at officers md accn and replacement/improvement of external water distribution system at mes colony, 122 ta bn, 133 we and 2 fod area at bb cantt, srinagar
Read moreImprovement to tangarpali distributary one side (l) c.c. guard wall, right side cut-off wall with bed lining from rd 4575.00 mtr. to 4800.00 mtr. off-taking rd 24384.00 mtr. of attabira branch canal for the year 2025-26
Improvement to tangarpali distributary one side (l) c.c. guard wall, right side cut-off wall with bed lining from rd 4575.00 mtr. to 4800.00 mtr. off-taking rd 24384.00 mtr. of attabira branch canal for the year 2025-26
Read moreImprovement to tangarpali s/m-1l c.c. cut-off wall two side (l) and (r) with bed lining from rd 1756.00 mtr. to 2136.00 mtr. off-taking at rd 503.00 mtr. of tangarpali distributary for the year 2025-26
Improvement to tangarpali s/m-1l c.c. cut-off wall two side (l) and (r) with bed lining from rd 1756.00 mtr. to 2136.00 mtr. off-taking at rd 503.00 mtr. of tangarpali distributary for the year 2025-26
Read moreof your Industry type