Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Double Wheel Barrow,Spare Wheel
|
| Description |
|
| Organisation | Materials | Ministry of Mines |
| Tender Id | GEM/2025/B/6570622 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 22, 2025 14:30 |
| End Date |
Expired
06/09/2025
Expired 296 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing double gate system at gate no 1 at calicut international airport_ sh_ electrical works for double gate system including aicmc for 8 years
Providing double gate system at gate no 1 at calicut international airport_ sh_ electrical works for double gate system including aicmc for 8 years
Read moreProcurement of colostomy bag (single unit and double unit) and stomahesive powder for ms-1 department
Procurement of colostomy bag (single unit and double unit) and stomahesive powder for ms-1 department
Read moreProvision of double end earth heel isolators with sequential interlocking for loading/unloading points over hubli division
For complete deion and other details, please refer to tender
Read moreCon from single bus arrangement to double bus arrangement at 66kv side of 220/66kv khadoli substation in ut of dnh and dd (3rd call).
Con from single bus arrangement to double bus arrangement at 66kv side of 220/66kv khadoli substation in ut of dnh and dd (3rd call).
Read moreSet of 3 stands for tm and gear case assembly and testing as per drawing no.ubl/el/ut/0325-1a. each consists of item no.1 stand for tm-1no. item no.2 stand for wheel set-2nos
For complete deion and other details, please refer to tender
Read moreRepairing of rear wheel hub both sides, repairing of front right side suspension sup-port, replacement of left side hoist cylinder, and removing the anchor pin, worn out bush and repairing of anchor pin housing and fitment of anchor bushing and pin.
Repairing of rear wheel hub both sides, repairing of front right side suspension sup-port, replacement of left side hoist cylinder, and removing the anchor pin, worn out bush and repairing of anchor pin housing and fitment of anchor bushing and pin.
Read moreof your Industry type