Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Restoration Of Breached Spot On Choudrigund Ladi Branch Of Vehji Canal
|
| Description |
Restoration Of Breached Spot On Choudrigund Ladi Branch Of Vehji Canal
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_IFC_235041_2 |
|
Reference Number |
Fresh e-NIT 27 of 2023-24 |
| Tender Fee | 200 |
| EMD | 4800 |
| Tender Value | |
| Place | Irrigation Division Shopian |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | October 30, 2023 15:30 |
| End Date |
Expired
06/11/2023
Expired 984 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Constt of gaushalla at village gulabgarh on the land granted to district animal husbandary department
Refer boq
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreRepairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Repairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreUpgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Upgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreof your Industry type