| Particulars | Details |
|---|---|
| Title |
Survey, Design And Execution Of Work Sewerage Scheme Missing Links In Division A Jammu City On Epc Mode With 6 Months Period Of Free Trial Run. Contract No Sdj/W/44/2024 25 2nd Call
|
| Description |
Survey, Design And Execution Of Work Sewerage Scheme Missing Links In Division A Jammu City On Epc Mode With 6 Months Period Of Free Trial Run. Contract No Sdj/W/44/2024 25 2nd Call
|
| Organisation | HAUDD | State Govt. and UT |
| Tender Id | 2024_HAUDD_265875_1 |
|
Reference Number |
E-NIT No 20 of 2024-25 Dated 25-11-2024 |
| Tender Fee | 10000 |
| EMD | 83 Lakh |
| Tender Value | - |
| Place | Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=815828 |
| Start Date | November 30, 2024 23:30 |
| End Date |
Expired
09/12/2024
Expired 677 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreExecution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode
Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode
Read moreProcurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreConstruction of 2 lane rob near rub at level crossing no. 429 on jalalpur (nh-719) to national highway-44 via susera kothi marg in gwalior in state of madhya pradesh on epc mode (length-960 meter)
Construction of 2 lane rob near rub at level crossing no. 429 on jalalpur (nh-719) to national highway-44 via susera kothi marg in gwalior in state of madhya pradesh on epc mode (length-960 meter)
Read moreConstruction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.
Construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.
Read moreSurvey, design and execution of work sewerage scheme missing links in division a jammu city on epc mode with 6 months period of free trial run. contract no sdj/w/25/2024-25
Survey, design and execution of work sewerage scheme missing links in division a jammu city on epc mode with 6 months period of free trial run. contract no sdj/w/25/2024-25
Read moreSurvey, design and execution of sewerage scheme talab tilo bohri missing link in jammu city jandk on epc fixed cost turnkey basis. contract no sdj/w/23/2024-25
Survey, design and execution of sewerage scheme talab tilo bohri missing link in jammu city jandk on epc fixed cost turnkey basis. contract no sdj/w/23/2024-25
Read moreSurvey, design and execution of sewerage scheme missing link division a jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/22/2024-25
Survey, design and execution of sewerage scheme missing link division a jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/22/2024-25
Read moreSurvey, design and execution of sewerage scheme talab tillo bohri missing link in jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/24/2024-25
Survey, design and execution of sewerage scheme talab tillo bohri missing link in jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/24/2024-25