Tender Details

Particulars Details
Title
Survey, Design And Execution Of Work Sewerage Scheme Missing Links In Division A Jammu City On Epc Mode With 6 Months Period Of Free Trial Run. Contract No Sdj/W/44/2024 25 2nd Call
Description
Survey, Design And Execution Of Work Sewerage Scheme Missing Links In Division A Jammu City On Epc Mode With 6 Months Period Of Free Trial Run. Contract No Sdj/W/44/2024 25 2nd Call
Organisation HAUDD | State Govt. and UT
Tender Id 2024_HAUDD_265875_1
Reference
Number
E-NIT No 20 of 2024-25 Dated 25-11-2024
Tender Fee 10000
EMD 83 Lakh
Tender Value -
Place Jammu
Link
View Original Tender Notice

https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=815828

Start Date November 30, 2024 23:30
End Date
Expired 09/12/2024

Expired 677 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta

Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta

Read more
Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode

Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode

Read more
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.

Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Construction of 2 lane rob near rub at level crossing no. 429 on jalalpur (nh-719) to national highway-44 via susera kothi marg in gwalior in state of madhya pradesh on epc mode (length-960 meter)

Construction of 2 lane rob near rub at level crossing no. 429 on jalalpur (nh-719) to national highway-44 via susera kothi marg in gwalior in state of madhya pradesh on epc mode (length-960 meter)

Read more
Construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.

Construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.

Read more
Survey, design and execution of work sewerage scheme missing links in division a jammu city on epc mode with 6 months period of free trial run. contract no sdj/w/25/2024-25

Survey, design and execution of work sewerage scheme missing links in division a jammu city on epc mode with 6 months period of free trial run. contract no sdj/w/25/2024-25

Read more
Survey, design and execution of sewerage scheme talab tilo bohri missing link in jammu city jandk on epc fixed cost turnkey basis. contract no sdj/w/23/2024-25

Survey, design and execution of sewerage scheme talab tilo bohri missing link in jammu city jandk on epc fixed cost turnkey basis. contract no sdj/w/23/2024-25

Read more
Survey, design and execution of sewerage scheme missing link division a jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/22/2024-25

Survey, design and execution of sewerage scheme missing link division a jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/22/2024-25

Read more
Survey, design and execution of sewerage scheme talab tillo bohri missing link in jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/24/2024-25

Survey, design and execution of sewerage scheme talab tillo bohri missing link in jammu city j and k on epc fixed cost turnkey basis. contract no sdj/w/24/2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise