Tender Details
Particulars | Details |
---|---|
Title |
Re Fabrication And Installation Of Cable Tray From Lt To O Meter And 7 Meter Of Washery Building At Moonidih Coal Washery Total Length 300 Meter
|
Description |
Re Fabrication And Installation Of Cable Tray From Lt To O Meter And 7 Meter Of Washery Building At Moonidih Coal Washery Total Length 300 Meter
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_BCCL_287258_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2023-24/E 664 |
Tender Fee | |
EMD | 9000 |
Tender Value | |
Place | OFFICE OF THE PROJECT OFFICER MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in |
Start Date | August 29, 2023 14:30 |
End Date |
06/09/2023 ( Expired 624 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreDensification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.377.000 to km.462.164 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Densification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.377.000 to km.462.164 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreInstallation of cable tray with support hanger in 132 kv main and side cable trenches including interior renovation of cable trenches at 132/33 kv gss, adityapur-i
Installation of cable tray with support hanger in 132 kv main and side cable trenches including interior renovation of cable trenches at 132/33 kv gss, adityapur-i
Read moreSpecial repairs to electric meter panel of bldg no. p-01 to p-07 at kadamba vamam and p-30 to p-38 at little binaga and special repairs to lt cables of tech bldg at nad under ge (seabird) karwar
Special repairs to electric meter panel of bldg no. p-01 to p-07 at kadamba vamam and p-30 to p-38 at little binaga and special repairs to lt cables of tech bldg at nad under ge (seabird) karwar
Read moreDemolition and re-construction of perimeter wall from children park to bldg no p-35 at af stn jaipur
Demolition and re-construction of perimeter wall from children park to bldg no p-35 at af stn jaipur
Read moreSpl repair replacement of ht oh line with ht ug cable of feeders no 5 from 66 kv mrs to 2 3 gr and number 10 posts at kv
Spl repair replacement of ht oh line with ht ug cable of feeders no 5 from 66 kv mrs to 2 3 gr and number 10 posts at kv 
 at tibri mil stn under ge gurdaspur
Read moreof your Industry type