Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtc Of Road From Shalbagan Bamutia Road(school Tilla) To Shalbagan Bamutia Road(saha Tilla) Via Master Tilla And Allied Road(l 0.925 Km) During The Year 2025 2026/Sh Side Berm Dressing, Cc Paver Block, Wbm 3, Grouting, Carpeting, Seal Coat Etc.
|
| Description |
Mtc Of Road From Shalbagan Bamutia Road(school Tilla) To Shalbagan Bamutia Road(saha Tilla) Via Master Tilla And Allied Road(l 0.925 Km) During The Year 2025 2026/Sh Side Berm Dressing, Cc Paver Block, Wbm 3, Grouting, Carpeting, Seal Coat Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_64329_1 |
|
Reference Number |
93/DNIT/EE/MNP/PWD(R n B)/2025-26 |
| Tender Fee | 1000 |
| EMD | 48257 |
| Tender Value | - |
| Place | Mohanpur |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=65435 |
| Start Date | August 02, 2025 22:30 |
| End Date |
Expired
08/08/2025
Expired 431 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Read moreDevelopment of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreMtc. of road ing from shalbagan-bamutia road towards narsingarh-durgabari road via master tilla (l- 1.25 km)during the year 2025- 26./sh side berm dressing, wbm-3,grouting, carpeting, seal coat etc.
Mtc. of road ing from shalbagan-bamutia road towards narsingarh-durgabari road via master tilla (l- 1.25 km)during the year 2025- 26./sh side berm dressing, wbm-3,grouting, carpeting, seal coat etc.
Read moreMtc. of road from nandi bari chowmuhani to mc tilla and shalbagan bamutia road to bhadrapalli(l-1.35km) during the year 2024-25/sh side berm dressing, wbm-3, grouting, carpeting, seal coat etc.
Mtc. of road from nandi bari chowmuhani to mc tilla and shalbagan bamutia road to bhadrapalli(l-1.35km) during the year 2024-25/sh side berm dressing, wbm-3, grouting, carpeting, seal coat etc.
Read moreMaintenance of road from bandhan bank (gandhigram) to shalbagan bamutia road via rajnagar during the year 2024- 25./sh side berm dressing,grouting, carpeting, seal coat etc. (l-1.60 km).
Maintenance of road from bandhan bank (gandhigram) to shalbagan bamutia road via rajnagar during the year 2024- 25./sh side berm dressing,grouting, carpeting, seal coat etc. (l-1.60 km).
Read moreFdr of road from shalbagan-bamutia road (sun brick field) to gochamura(l-1.50km)/sh patch repairing, carpeting, side berm dressing and construction of unlined drain etc
Fdr of road from shalbagan-bamutia road (sun brick field) to gochamura(l-1.50km)/sh patch repairing, carpeting, side berm dressing and construction of unlined drain etc
Read moreFdr of road from vip road to shalbagan mohanpur road via holy cross school(l-1.50km) during the year 2024-25/sh side berm dressing, wbm-3, grouting, carpeting, seal coat etc.
Fdr of road from vip road to shalbagan mohanpur road via holy cross school(l-1.50km) during the year 2024-25/sh side berm dressing, wbm-3, grouting, carpeting, seal coat etc.
Read moreMtc. of road from agartala-bamutia road (jalilpur point) to bamutia ibb connecting road (l1.20km.)/sh patch repairing,carpeting,side berm dressing etc.
Mtc. of road from agartala-bamutia road (jalilpur point) to bamutia ibb connecting road (l1.20km.)/sh patch repairing,carpeting,side berm dressing etc.
Read moreFlood damage repair and strengthening of road from shalbagan to bamutia (l-11.35km)/ sh construction of rcc retaining wall and rcc drain in the portion of saha tilla under bamutia rd block
Flood damage repair and strengthening of road from shalbagan to bamutia (l-11.35km)/ sh construction of rcc retaining wall and rcc drain in the portion of saha tilla under bamutia rd block
Read moreof your Industry type