Tender Details

Particulars Details
Title
Construction Of Approach Road Between Rajiv Nagar To Sewa Dham Road (Part I) In Gokalpur Constituency (Ac 68).
Description
Construction Of Approach Road Between Rajiv Nagar To Sewa Dham Road (Part I) In Gokalpur Constituency (Ac 68).
Organisation Irrigation and Flood Control | State Govt. and UT
Tender Id 2024_IFC_262675_1
Reference
Number
62/EE/CD-IV/IFC/2024-25
Tender Fee 0
EMD 1.14 Lakh
Tender Value
Place East
Link
View Original Tender Notice

https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344241

Start Date September 23, 2024 22:10
End Date
Expired 27/09/2024

Expired 643 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Read more
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)

Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)

Read more
01(e) /po/k-i of 2026-2027, sl02

Construction of cement concrete road from mohosen house to hasen skhouse at khaltipur chand mandal (3209014013/rc/yd/320201060635695)

Read more
Construction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod

Construction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod

Read more
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.

Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.

Read more
Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat

Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat

Read more
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)

Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, &#x0d (length - 27.00 km)&#x0d

Read more
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Under district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1

Under district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise