Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fabrication And Erection Of Wind Barrier System (Total Height 09 Mtr. I.E 06 Mtr. Height Wind Barrier Panel With Steel Structure Installed Over 03 Mtr. Height Boundary Wall) Along Railway Siding And Coal Corridor Road Of Balram Ocp Under Hingula Area
|
Description |
Fabrication And Erection Of Wind Barrier System (Total Height 09 Mtr. I.E 06 Mtr. Height Wind Barrier Panel With Steel Structure Installed Over 03 Mtr. Height Boundary Wall) Along Railway Siding And Coal Corridor Road Of Balram Ocp Under Hingula Are
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_313345_1 |
Reference Number |
MCL/Samb/Civil-TC/e-Tender/ 24-25/06 Dt.24.07.2024 |
Tender Fee | 0 |
EMD | 11.11 Lakh |
Tender Value | |
Place | Balram OCP under Hingula Area, Odisha |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324725 |
Start Date | July 25, 2024 15:30 |
End Date |
10/08/2024 ( Expired 316 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fabrication and erection of wind barrier system (09m height) from weigh bridge no.11 and 12 shed towards triveni chhack and east direction of handidhua coal dump of ananta ocp under jagannath area
Fabrication and erection of wind barrier system (09m height) from weigh bridge no.11 and 12 shed towards triveni chhack and east direction of handidhua coal dump of ananta ocp under jagannath area
Read moreFabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.
Read moreCleaning of drains, berms along concrete road from zero point to ektali bridge, coal corridor to railway siding and outsourcing patch under balram ocp under hingula area.
Cleaning of drains, berms along concrete road from zero point to ektali bridge, coal corridor to railway siding and outsourcing patch under balram ocp under hingula area.
Read moreExtension of wharf wall and drain for coal loading platform at railway siding no. 09 at balram ocp under hingula area.
Extension of wharf wall and drain for coal loading platform at railway siding no. 09 at balram ocp under hingula area.
Read moreFabrication and erection of wind barrier system (total height 09 mtr. i.e 06 mtr. height wind barrier panel with steel structure installed over 03 mtr. height boundary wall) along railway siding and coal corridor road of balram ocp under hingula area
Fabrication and erection of wind barrier system (total height 09 mtr. i.e 06 mtr. height wind barrier panel with steel structure installed over 03 mtr. height boundary wall) along railway siding and coal corridor road of balram ocp under hingula are
Read moreFabrication and erection wind barrier system (06 mtr. height) along coal stock yard and coal corridor road of hingula ocp under hingula area
Fabrication and erection wind barrier system (06 mtr. height) along coal stock yard and coal corridor road of hingula ocp under hingula area
Read moreFabrication and erection of wind barrier system (08 m height and 1000m length) along the coal stock no. 2 and 3 of garjanbahal ocp, basundhara area.
Fabrication and erection of wind barrier system (08 m height and 1000m length) along the coal stock no. 2 and 3 of garjanbahal ocp, basundhara area.
Read moreSpraying of water on coal transportation road from field time office to siding no.09 and from weighbridge no. 12 to railway siding no.10 (balance period after completion of on-going contract) under balram ocp, hingula area.
Spraying of water on coal transportation road from field time office to siding no.09 and from weighbridge no. 12 to railway siding no.10 (balance period after completion of on-going contract) under balram ocp, hingula area.
Read moreAnnual cleaning and sweeping of coal sampling storage room, laboratory room and peripheral area at railway siding no. 09 and chp office, sub-station and challan room of chp at balram ocp under hingula area. (for a period of 730 days)
Annual cleaning and sweeping of coal sampling storage room, laboratory room and peripheral area at railway siding no. 09 and chp office, sub-station and challan room of chp at balram ocp under hingula area. (for a period of 730 days)
Read moreCleaning of drains, berms along concrete road from zero point to ektali bridge, coal corrider to railway siding and outsourcing patch under balram ocp under hingula area.
Cleaning of drains, berms along concrete road from zero point to ektali bridge, coal corrider to railway siding and outsourcing patch under balram ocp under hingula area.
Read moreof your Industry type