Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr Of Pmgsy Handed Over Road From Srimantapur Masjid To Sonamura Nidaya Road Near Rabindrangar (L 1.45 K.M) Along With Road Side Pucca Drain From Under The Jurisdiction Of Sonamura Sub Division, Pwd (R And B),During The Year 2024 2025
|
| Description |
Soling, Wbm, Grouting, Carpeting, Seal Coat, Pcc, Brickwork, Plastering Etc
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_53887_1 |
|
Reference Number |
98/R/DNIeT/SE-IV/PWD/(R and B)/2024-2025 |
| Tender Fee | 4000 |
| EMD | 1.02 Lakh |
| Tender Value | - |
| Place | sonamura |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54738 |
| Start Date | October 09, 2024 17:40 |
| End Date |
Expired
18/10/2024
Expired 725 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fdr/restoration of road from sonamura nidaya road to santipalli main road under kathalia r.d bock
Patch wbm-iii, carpeting with sand seal coat, pucca drain and other allied works.
Read moreFdr of sonamura nidaya road to morjonia road(l- 1.33 km) under the jurisdiction of sonamura sub-division, pwd (r and b),during the year 2024-25.
Fdr of sonamura nidaya road to morjonia road(l- 1.33 km) under the jurisdiction of sonamura sub-division, pwd (r and b),during the year 2024-25.
Read morePr of handed over pmgsy road from sonamura-boxanagar road to madhyapara (link no. 056) (l- 0.742 km)/
Patch soling, patch metalling, re-carpeting, road side drain and other allied works under pwd (r and b) boxanagar sub-division during the year 2023-24 under sjtny.
Read moreFdr of khedabari to madhyapara road l-1.83 k.m portion from (ch 1.00 k.m to 1.83 k.m) along with road side pucca drain of 90.00 m under the jurisdiction of sonamura sub-division, pwd (r and b),during the year 2024-2025
Soling, wbm, grouting, carpeting, seal coat, pcc, brickwork, plastering etc
Read moreConstruction of pucca drain from pabitra shil house to sufiya khatun agri land (at sonamura-nidaya nec road to tetaiyamura road from ch. 0.680 km)
Sh - pucca drain (l-123.80 mtr) and rcc covered slab.
Read moreFdr of khedabari to madhyapara road l-1.83 k.m portion from (ch 0.00 k.m to 1.00 k.m) under the jurisdiction of sonamura sub-division, pwd (r and b),during the year 2024-2025
Soling, wbm, grouting, carpeting, seal coat etc.
Read moreFdr to pmgsy handed over road from sarkar tila to champamura bazar (l_ 4 point 30 km) during the year 2024_25_sh_patch repairing, patch metalling, carpeting, recarpeting, soling, protection work, pucca drain and other ancillary works
Fdr to pmgsy handed over road from sarkar tila to champamura bazar (l_ 4 point 30 km) during the year 2024_25_sh_patch repairing, patch metalling, carpeting, recarpeting, soling, protection work, pucca drain and other ancillary works
Read moreFdr/restoration of damaged road from sonamura - nidaya road near bashpukur tri-junction to birampur ( l- 2.32 km) within the jurisdiction of kathalia pwd (randb) sub-division during the fy 2024-25
Removal of unsuitable soil, patch grouting, patch carpeting with sand seal coat, filling of mixed class brick bats, palasiding, kutcha drain and other allied works.
Read moreFdr of roads fromi) kathalia to indhuria via naldepa(l-8.20km ch.2.98km retaining wall length-43.45mtr ii) sonamura nidaya road to barnarayan paschim para(l-0.653km ch. 0.58km retaining wall length-32.55mtr
Iii) machima to jatrapur via nathpara (l-1.25 km ch. 0.03 km retaining wall length-16.50 mtr in the jurisdiction of kathalia pwd(randb) sub-division during the year 2025-26 under kathalia rd block sh rcc retaining wall and other allied work
Read morePr of pmgsy handed over road from julaibari to munsimura (link no. 076) (l-1.861 km) portion from ch. 0.00 km to 1.861 k.m , pr l-1.861 km under the jurisdiction of sonamura sub-division, pwd (r and b) during the year 2023-24
Earth work in embankment soling, wbm-iii, grouting, carpeting, seal coat etc.
Read moreof your Industry type