Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Restoration And Repairs Of Nh 129 A From Peren To Dimapur
|
| Description |
Restoration And Repairs Of Nh 129 A From Peren To Dimapur Section From Km. 126.775 To Km. 146.208 Package Ii Length 19.433 Km. In The State Of Nagaland
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_NHIDC_756036_1 |
|
Reference Number |
NHIDCL/RO-Kohima/PD-II 2022-23 10 |
| Tender Fee | 11800 |
| EMD | 7.2 Lakh |
| Tender Value | - |
| Place | NHIDCL, RO- Kohima |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | June 02, 2023 22:30 |
| End Date |
Expired
23/06/2023
Expired 1187 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreImprovement to road from nh-181 to basavanapura (nh181) via mallayanapura ch 0.00km to 5.90km in gundlupete taluku chamarajanagara district (one time improvement)
Improvement to road from nh-181 to basavanapura (nh181) via mallayanapura ch 0.00km to 5.90km in gundlupete taluku chamarajanagara district (one time improvement)
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSupply of drugs to district hospital and epidemic diseases hospital mysuru
Supply of drugs to district hospital and epidemic diseases hospital mysuru
Read moreProposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Read moreUpgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru.
Upgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru.
Read moreShort term maintenance contract of peren - dimapur section on nh-129a
Short term maintenance contract of peren - dimapur section on nh-129a from existing km 120.500 to km 123.380 design km 120.320 to km 123.200 length 2.88 km in the state of nagaland in fy 2024-25 percentage rate and work order basis 2nd call.
Read moreShort term maintenance contract of peren - dimapur section on nh-129a
Short term maintenance contract of peren - dimapur section on nh-129a from existing km 120.500 to km
 123.380 design km
 120.320 to km
 123.200 length 2.88
 km in the state of nagaland in fy 2023- 24 percentage rate and work order basis.
Read moreRestoration and repair of peren-dimapur road
Restoration and repair of peren-dimapur road from existing km 183.850 to km 190.850 length 7.00 km section of nh-129a in the state of nagaland in the fy 2023- 24 percentage rate and work order basis
Read moreof your Industry type